My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County Public Utility District 4/9/2017
>
Contracts
>
6 Years Then Destroy
>
2019
>
Snohomish County Public Utility District 4/9/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 11:25:58 AM
Creation date
5/18/2017 11:25:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County Public Utility District
Approval Date
4/9/2017
Council Approval Date
3/29/2017
End Date
6/30/2019
Department
Public Works
Department Project Manager
Scott Weirich
Subject / Project Title
Wastewater Energy Cohort Program
Public Works WO Number
20170457
Tracking Number
0000599
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> STRATEGIC ENERGY MANAGEMENT (SEM) FUNDING AGREEMENT <br /> PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY <br /> and <br /> CITY OF EVERETT <br /> This Strategic Energy Management ("SEM") Funding Agreement ("Agreement") is executed by and between <br /> Public Utility District No. 1 of Snohomish County (UTILITY) and the City of Everett (END USER) for its facility at <br /> 4027 4th St. SE, Everett, WA, 98201 (Service Address). The UTILITY and END USER are also referred to herein <br /> individually as "Party" and collectively known as the "Parties." <br /> WHEREAS, END USER has facilities in UTILITY's service area and purchases power from UTILITY; and <br /> WHEREAS, UTILITY is a public utility organized under the laws of the State of Washington, and sells <br /> electric power to END USER that is acquired from Bonneville Power Administration (BPA); and <br /> WHEREAS, BPA provides funds to UTILITY to pass through to END USER as the END USER <br /> implements energy saving measures and completes related activities under the BPA SEM program at END <br /> USER's facility; and <br /> WHEREAS, The Parties agree to enter into a two-year BPA SEM Program engagement, herby referred to <br /> as Wastewater Energy Coaching (WEC), which emphasizes participation in WEC training sessions and <br /> implementation of low-cost energy efficiency measures. <br /> NOW, THEREFORE, the PARTIES hereby agree to the following: <br /> 1. This Agreement is effective upon execution and will continue until the PARTIES' obligations have been <br /> met. If this Agreement has not been executed (signed) by END USER and returned to the UTILITY within <br /> 30 calendar days of being executed by UTILITY, the terms of this Agreement shall be null and void. <br /> 2. END USER shall designate a WEC "Executive Sponsor" to provide management support for the <br /> implementation of this project by completing Exhibit 1 of the Agreement. <br /> 3. END USER shall designate a WEC "Energy Champion" to (a) attend training workshops; (b) coordinate <br /> END USER's implementation activities; (c) serve as the primary contact for the WEC Providers (Energy <br /> Smart Industrial Technical Service Providers, Energy Smart Industrial Program staff); (d) implement <br /> suitable SEM action items; and (e) track implementation dates and if necessary, associated costs by <br /> completing Exhibit 1 of the agreement. <br /> 4. If agreed to by END USER and UTILITY, the Energy Champion will oversee the design and installation of <br /> a Performance Tracking System (PTS), capable of measuring and tracking energy consumption and <br /> energy savings performance. The Energy Champion will track installation costs and provide the data <br /> required to complete the PTS Verification Report. <br /> 5. END USER agrees to provide BPA, its designated WEC Provider, and UTILITY with the information <br /> necessary to establish and maintain a baseline energy model (Monitoring, Targeting, and Reporting <br /> [MT&R] model). The MT&R model will define the pre-engagement baseline and measure the energy <br /> savings associated with the implementation of END USER's WEC program. Necessary information <br /> includes electric energy consumption and plant loading data, and may also include natural gas <br /> consumption and any other relevant data that would impact electrical energy use. <br /> Energy Smart <br /> Industrial <br /> BPA ENERGY EFFICIENCY <br /> SEM Funding Agreement,7-29-2016 1 <br /> JRK 1.13.2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.