UZ
<br /> Run Date: 6/25/2012 City of Everett-Public Works Department Cutoff Date: 6/8/2012
<br /> Time: 2:25 PM Contract Estimate Voucher .
<br /> Project: 277 For.Work Order#3437 Contractor: IMCO General Construction,Inc.
<br /> Transmission Line 3,Phase 7 Estimate#9 2116 Buchanan Loop
<br /> WO 3437 BID:$5,728,827.52 Ferndale,WA 98248
<br /> TOTAL BID:$5,728,827.52
<br /> Unit Plan Total Previous Present Total Previous Present
<br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount
<br /> 0001 Mobilization LS 430,000.00 1.00 1.0000 1.0000 0.0000 430,000.00 430,000.00 0.00
<br /> 0002 Project Surveying LS 30,000.00 1.00 1.0000 1.0000 0.0000 30,000.00 30,000.00 0.00
<br /> 0003 Construction Work Plan LS 69,000.00 1.00 1.0000 1.0000 0.0000 69,000.00 69,000.00 0.00
<br /> 0004 Force Account FA 1.00 50,000.00 15,666.6900 15,666.6900 0.0000 15,666.69 15,666.69 0.00
<br /> 0005 Temporary Erosion&Sedimentation Control LS 32,000.00 1.00 1.0000 1.0000 0.0000 32,000.00 32,000.00 0.00
<br /> 0006 Temporary Silt Fence LF 7.00 450.00 450.0000 450.0000 0.0000 3,150.00 3,150.00 0.00
<br /> 0007 Construction Limit Fence LF 4.00 1,260.00 5,055.0000 5,055.0000 0.0000 20,220.00 20,220.00 0.00
<br /> 0008 Furnish Steel Pipe Piles LF 84.00 15,480.00 14,585.7000 14,585.7000 0.0000 1,225,198.80 1,225,198.80 0.00
<br /> 1 0009 Install Steel Pipe Piles EA 1,730.00 170.00 170.0000 170.0000 0.0000 294,100.00 294,100.00 0.00
<br /> 0010 Elevated Pile Cap-Type V EA 6,350.00 85.00 85.0000 85.0000 0.0000 539,750.00 539,750.00 0.00
<br /> 0011 Elevated 48"Dia.Pipeline No.3 LF 401.00 3,813.00 3,815.0000 3,815.0000 0.0000 1,529,815.00 1,529,815.00 0.00
<br /> 0012 Restrained Expansion Coupling EA 18,000.00 7.00 7.0000 7.0000 0.0000 126,000.00 • 126,000.00 0.00
<br /> 0013 Mechanical Expansion Joint EA 63,000.00 1.00 1.0000 1.0000 0.0000 63,000.00 63,000.00 0.00
<br /> 0014 Elevated Walkway-Pipeline No.4 LF 180.00 3,820.00 3,820.0000 3,820.0000 0.0000 687,600.00 687,600.00 0.00
<br /> 0015 Access Manway EA 9,400.00 4.00 4.0000 4.0000 0.0000 37,600.00 37,600.00 0,00
<br /> 0016 Air-Vacuum/Air Release Valve Assembly EA 18,400.00 1.00 1.0000 1.0000 0.0000 18,400.00 18,400.00 0.00
<br /> 0017 Connect.To Ex.Elevated 48"Dia.Steel Pipe EA 7,500.00 2.00 2.0000 2.0000 0.0000 15,000.00 15,000.00 0.00
<br /> 0018 Electrical Continuity bonding EA 135.00 85.00 85.0000 85.0000 0.0000 11,475.00 11,475.00 0.00
<br /> 0019 Remove&Dispose/Salvage Existing Pipeline LS 78,602.00 1.00 1.0000 1.0000 0.0000 78,602.00 78,602.00 0.00
<br /> No.3
<br /> 0020 Remove&Dispose/Salvage Ex.Creosote Pile LS 73,000.00 1.00 1.0000 1.0000 0.0000 73,000.00 73,000.00 0.00
<br /> Support
<br /> 0021 Hydroseed-Seed Mix 1 ACRE 2,300.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00
<br /> 0022 Hydroseed-Seed Mix 2 ACRE 1,030.00 5.00 0.0000 0.0000 0.0000 0.00 0.00 0.00
<br /> 0023 Traffic Control Plan&Maintenance LS 120,000.00 1.00 1.0000 1.0000 0.0000 120,000.00 120,000.00 0.00
<br /> 0024 Traffic Control Labor HRS 50.00 800.00 410.5000 410.5000 0.0000 20,525.00 20,525.00 0.00
<br /> 0025 Record Drawings LS 5,000.00 1.00 1.0000 1.0000 0.0000 5,000.00 5,000,00 0.00
<br /> 0026 Vibration&Settlement Monitoring LS 50,000.00 1.00 1.0000 1.0000 0.0000 50,000.00 50,000.00 0.00
<br />
|