My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/09/26 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/09/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 9:16:00 AM
Creation date
5/19/2017 9:15:11 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/26/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET ? <br /> PROJECT TITLE: <br /> Award the bid for the 2011 Briefing COUNCIL BILL# <br /> Landslide Repair—Lowell- Proposed Action Originating Department Public Works <br /> Larimer Road Project to Consent Contact Person Ryan Sass,P.E. <br /> Granite Construction Company Action Phone Number 425-257-8942 <br /> First Reading FOR AGENDA OF Sept. 26, 2012 <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head ,;,=. _ay_i <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Lowell-Larimer Road 8/29/12 Council Bid summary <br /> authorized call for bids <br /> Amount Budgeted $ 391,901.00 <br /> Expenditure Required $ 391,901.00 Account Number(s): PW3468 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Bids for the 2011 Landslide Repair—Lowell-Larimer Road Project were opened on September 18,2012, <br /> with sixteen bid proposals received for the construction project. Granite Construction Company, of Everett, <br /> WA, submitted the lowest responsive and responsible bid in the amount of$391,901.00. <br /> This project will construct the repairs needed to repair the shoulder damages caused by a landslide that <br /> occurred in 2011. The City had to close one lane of the road as a precautionary measure because of erosion <br /> under a 230 foot-long segment of the shoulder of the road. The construction will repair a 250 linear foot <br /> segment of the shoulder and include drainage improvements. <br /> The funding source for the construction contract is: <br /> Fund 303,Program 094 $ 391,901.00 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Award the bid for the 2011 Landslide Repair—Lowell-Larimer Road Project to Granite Construction <br /> Company in the amount of$391,901.00, including Washington State sales tax. <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.