Laserfiche WebLink
• Version 0913 <br /> ERIK UTTER <br /> ago MUM <br /> Broadcast gL ' pTent ,Jpgrade <br /> xHibit B <br /> Compensation <br /> Base System Amount <br /> Production Hardware-_- ------------,--`---- ---------$93,971 <br /> Master Control Hardware $60,4101 <br /> Integration I $84,545 <br /> I Base System Sub Total I $238,926 <br /> Option One or One A s Camera Upgrade <br /> Provide and install compatible upgrades from analog to digital for cameras in the Council <br /> Chambers. Upgraded cameras must be integrated with existing equipment and the new <br /> capture,switching, character generator. <br /> Option One-Camera Upgrade Amount <br /> Hardware <br /> --_---- <br /> _.._------------ j $4,076 <br /> Integration Services J • $2,941 <br /> {Total Option Price � $7,0181 <br /> • <br /> Provide and install new HD PTZ Cameras in the Council Chambers. Cameras to be installed in <br /> existing locations and integrated with existing equipment in addition to the new production, <br /> switching, graphics and transmission equipment. <br /> Option One A-HD Camera Upgrade Amount <br /> I Hardware ---- ------------�---------$31,455 <br /> Integration Services — $4,1181 • <br /> Total Option Price $35,5731 • <br /> Utter Associates <br /> 1008 Western,Suite 201 t 206-829-8172 <br /> Seattle,WA 98104 8 e michael@utterassociates.com <br /> 24 <br />