My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 9:57:21 AM
Creation date
5/19/2017 9:56:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Preconstruction Services Contract <br /> " General Contractor/Construction Manager Services for <br /> % '_=1�f!FJf3ET1'` Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream), Phase C2(Solids Handling) <br /> shown below for the duration of Preconstruction Services, the Owner <br /> reserves the right either (1) to demand equal quality replacement of said key <br /> personnel or (2) to terminate the Preconstruction Contract and instead <br /> contract with the next highest scored firm for Preconstruction Services. <br /> Selection of the GC/CM was partially based on the quality of staff proposed, <br /> and a lower point total may have resulted by not including those staff in the <br /> Proposal. <br /> Primary Personnel <br /> Position Title Name of Individual <br /> Corporate Executive Tyler Kimberley <br /> Project Manager Todd Pike <br /> Project Superintendent Kelly Brown <br /> Project Engineer Paul Prozinski <br /> Scheduler Paul Prozinski <br /> Cost Estimator Todd Pike <br /> Backup Personnel <br /> Position Title Name of Individual <br /> Project Manager Paul Prozinski <br /> Project Superintendent Greg Burress <br /> Project Engineer CJ Handforth <br /> Scheduler Brett Nimes <br /> Cost Estimator Mark Stouder <br /> 16. No Waiver: No payment, whether monthly or final, to the GC/CM for any <br /> Project work shall constitute a waiver or release by the Owner of any claims, <br /> rights, or remedies it may have against the GC/CM under this Contract or by <br /> law, nor shall such payment constitute a waiver, remission, or discharge by <br /> the Owner of any failure or fault of the GC/CM to satisfactorily perform the <br /> Project work as required under this Contract. Failure by Owner to require or <br /> enforce any provision of this Contract shall not constitute a waiver or release <br /> by Owner of any rights or remedies, or to require contractual performance by <br /> GC/CM. GC/CM agrees to perform all services under this contract in <br /> accordance with all applicable federal, state, and local laws and regulations. <br /> City of Everett Page 8 of 13 October 3,2012 <br /> Water Pollution Control Facility Expansion <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.