My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 9:57:21 AM
Creation date
5/19/2017 9:56:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 Preconstruction Services Contract <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream), Phase C2(Solids Handling) <br /> be negotiated by the Owner and GC/CM. Any additional work shall be <br /> individually authorized in writing as an amendment to this Contract, signed by <br /> both the Owner and GC/CM. The amendment must be executed prior to <br /> performance of the additional work by the GC/CM. Unless otherwise provided <br /> for in'an amendment, such additional work shall be performed at the fully <br /> loaded hourly rates as identified in Attachment A, "Preconstruction Work <br /> Plan" to this Contract. <br /> 25. Notices: Notices required in this Contract shall be in writing and either hand <br /> delivered during normal business hours, or mailed with postage prepaid, to <br /> the following addresses: <br /> City of Everett IMCO General Construction, Inc. <br /> 3200 Cedar Street 2116 Buchanan Loop <br /> Everett, WA 98201 Ferndale, WA 98248 <br /> Attn: John Nottingham, P.E. Attn:Tyler Kimberley <br /> 26. Severability: If any portion of this Contract is found to be invalid by the <br /> Superior Court of Snohomish County, such invalidation of such portion shall <br /> not invalidate the remaining portions of the Contract, and they shall remain in <br /> full force and effect as written. <br /> ATTACHMENTS: The following documents, whether attached•hereto or not, are <br /> hereby incorporated by reference and made a part of this Contract, as if set forth herein <br /> in full: <br /> Attachment A: Preconstruction Work Plan <br /> Attachment B: Preconstruction Services Scope of Work <br /> Attachment C: Insurance Requirements <br /> City of Everett Page 12 of 13 October 3,2012 <br /> Water Pollution Control Facility Expansion <br /> 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.