Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET - 9 <br /> PROJECT TITLE: <br /> A call for bids for the City Briefing COUNCIL BILL# <br /> Center Safety Improvements Proposed Action Originating Department Public Works <br /> Project Consent Contact Person Ryan Sass,P.E. <br /> Action Phone Number 425-257-8942 <br /> First Reading FOR AGENDA OF Nov. 7, 2012 <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> w <br /> Department Head Air- <br /> CAA 4r, <br /> Council President i / <br /> Location Preceding Action Attachments Departmt( fiproval <br /> Various locations in 12/02/09 Ord. 3157-09 Vicinity map <br /> downtown area passed • <br /> Amount Budgeted $ 397,000.00 est. <br /> Expenditure Required -0- Account Number(s): PW3383 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> • <br /> DETAILED SUMMARY STATEMENT: <br /> The construction plans and specifications are complete and the project is ready to be advertised for <br /> construction bids. This project will construct new safety improvements in the downtown Everett area which <br /> include: install new stop/yield signs;, stop/yield bars; advance warning signs; signal display backplates; <br /> interconnect signals along Broadway from 231d to 33rd;install, connect and synchronize signals along <br /> Broadway; install three traffic operation cameras on Broadway; and install left turn phase at Rucker and 37th <br /> St. <br /> • <br /> The budget for the estimated contract is$397,000.00 and the sources of funds are: <br /> Fund 303 —HSIP (Federal Grant) $ 397,000.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a call for bids for the City Center Safety Improvements Project. <br /> • <br /> 47 <br />