My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/12/18 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/12/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 9:05:56 AM
Creation date
5/22/2017 9:04:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 :7 <br /> Summary of Volunteer Hours <br /> Activity Item People tars. Times Total Hr. @ $201 hr. <br /> Planning Organizing/Scheduling 4 2 4 32 640 <br /> Protect Completion Party 4 4 1 16 320 <br /> Mgmt. Overall Coordinator 1 40 1 40 800 <br /> Purchasing Plantings/Materials 5 2 5 20 400 <br /> Site Labor Grading & Form Work 2 7 3 42 840 <br /> Concrete Placement 5 6 2 60 1,200 <br /> 800 <br /> Bench Installation 4 5 2 <br /> Placing Rock/Cobbles 3 8 2 48 960 <br /> Placing Topsoil 2 6 1 12 240 <br /> Installing Drain/Rock 3 6 1 188 36600 <br /> Seeding &Fertilizing 2 6 2 4 1,440 <br /> Planting Trees72 <br /> Planting Ivy & B. Berries 4 55 2 12 8000 <br /> Truck Driving <br /> Misc. Installing Refuse Recpts. 2 4 1 8 160 <br /> Totals 464 hr. $9,280 <br /> Specialty Landscape Consultant 1 16 hr. @ $75/hr. = $1,200 <br /> Equipment Operator 1 44 hr. @ $65/hr. = 2.860 <br /> Total 60 hr. $4,060 <br /> Grand Totals 525 hr. $13,340 <br /> 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.