My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/12/18 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/12/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 9:05:56 AM
Creation date
5/22/2017 9:04:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> MAYOR BILL MOORE'S RECORD <br /> 1977-1990 <br /> Streets(included sewer and water limes): <br /> 75`I'Street/Hardeson Road/80th Streetfi6Ih Ave.W. industrial project <br /> Merrill Creek Parkway/23rd Avenue W and Hardeson Road extension <br /> Widen Evergreen Way <br /> Widen Everett Mall Way <br /> Casino Road widening <br /> Creation of the street overlay fund <br /> Hewitt, Oakes and Lombard bridges replacement over BNSF railway <br /> Menill &Ring Creek bridge replacement <br /> Glenwood Creek bridge replacement <br /> 35th Avenue W. <br /> Campus Parkway <br /> Improvement of Beverly Lane(Phase 2) <br /> Improvement of Beverly Blvd. (Phase 2) <br /> Water System Improvements: <br /> Water system filtration facility <br /> Cover water reservoirs <br /> Replace water transmission lines from the Sultan Basin <br /> Walter H21120 million gallon water storage facility <br /> Sewer System Improvements: <br /> SW Everett Sewer Interceptor <br /> South Everett Sewer Interceptor <br /> 92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.