My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3429 15TH ST 2017-05-22
>
Address Records
>
15TH ST
>
3429
>
3429 15TH ST 2017-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 11:26:07 AM
Creation date
5/22/2017 11:26:07 AM
Metadata
Fields
Template:
Address Document
Street Name
15TH ST
Street Number
3429
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yi From: 11 /07/2015 19: 18 #365 P.001 /001 <br /> PUSLIC WORKS DEPARTMENT <br /> Utilities Dzvision,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> � <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Servzce Oxder $30,703. Service Order# <br /> Contact Pexson Ed Boum� Telephone# 503 348-8093 <br /> Requested By Jian Spooner Date of Request <br /> Pxoperty Owner(name) �NSF <br /> Charge Cost to(name if different flzan owner) Five Star Builders Inc. Attr1: Ed Bouma <br /> Address P O Box 555 City Banks, Or Zip 97106 <br /> Installation Location 3�429 15th St <br /> Installation type/description/size/etc. Install 4" Compound rr�eter w/pro read in vault per C.O.E. <br /> standard. Niust have fina6 grade to install vau6#. <br /> � The following estirnate is based upon the Utilities Division providing all labor, equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover fhe total expense for labor,materiaI,equipment rental and <br /> adininistrafive costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> insfallation. <br /> '�Deposit must be paid prior fo ordering parts or scheduling work. <br /> �'Must have valid Public Works d'ermit before work can be perforrned. <br /> WATER 1VIETERS 3"AND LAR GER 11�IAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: Bldg.Permit Center <br /> Material $10367.00 Mark Sadler <br /> Labor and Benefits $15820.00 Matt Welborn <br /> Equipment Rental $750.00 Randy AIIen <br /> Paul McKee <br /> Tax $1266.00 Jim Spooner <br /> Kirk Brooks <br /> 12estoration $1900.00 <br /> TOTAI. $30,703.00 <br /> Prepared by: Jim Spooner Date Estimate Prepared 9/25/2015 <br /> Accepted by _ ��Representing ��e �-�� �jVt-1 C'�l2S , �� . <br /> ESTIMAT�GO(3D FOR 6 MONTHS <br /> S:1;�Common\clerical\Cost.est12015�3429 15'h St rev � �� <br /> lofl <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.