My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/01/30 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/01/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 11:33:05 AM
Creation date
5/22/2017 11:32:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/30/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ID 3 <br /> Assumptions <br /> 1. Model will be provided either in Innovyze's H2OMAP or InfoWater. <br /> 2. Model provided by City is calibrated and contains all necessary pipes, pumps, and <br /> reservoirs with the exception of system connections, planned changes in the vicinity of <br /> Reservoir 2 and Reservoir 4, and the changes currently being implemented to serve the <br /> Tulalip area. <br /> 3. Calibrated Alderwood, Mukilteo, and Silver Lake models are included. <br /> 4. The analysis will be performed assuming steady-state system conditions. <br /> 5. Model validation is achieved if model and observed results for pressure agree to within ±5 <br /> psi. <br /> Deliverables <br /> 1. Updated calibrated hydraulic model capable of simulating the Everett Water transmission <br /> • <br /> and distribution systems in both steady state and extended period modes. <br /> 2. E-mailed Word and PDF files of the draft and final addendum Chapter 4. <br /> 3. Model figure to show projects to be included in the Capital Improvement Plan. <br /> Task S — Capital Improvement Plan (CWP Chapter 9) <br /> Objective <br /> Prepare a Capital Improvement Plan update that provides a project description, schedule,costs, <br /> prioritization, and justification. <br /> HDR Services <br /> 1. Update the capital improvement projects in a'summary spreadsheet table by year far the <br /> first 6 years, in 6 year increments for the next 18 years,and projects beyond the 25 year <br /> time frame. <br /> 2. Prepare budgetary cost estimates for the proposed CIP projects. <br /> City Responsibilities <br /> 1. Work with HDR team to evaluate alternatives and select CIP projects. <br /> 2. Provide recent City water project bid tabulations to be used in developing the cost <br /> estimating tool. <br /> 3. Assist in the development of the Capital Improvement Listing and Map Development. <br /> 4. Review and comment on draft Chapters 9 addendum. <br /> Assumptions <br /> 1. City will provide available similar project cost information to help set up cost models. <br /> 2. City will provide current CIP database and table for updating. <br /> Deliverables <br /> 1. Updated draft and final CIP table. <br /> Addendum to the 2007 Comprehensive Water Plan January 9,2013 <br /> Exhibit A—Scope of Services Page 8 <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.