Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Professional Services . Briefing COUNCIL BILL# <br /> Agreement with HDR Proposed Action Originating Department Public Works <br /> Engineering,Inc. to Provide Consent Contact Person Souheil Nasr <br /> Engineering Services for the Action Phone Number (425)257-7210 <br /> Addendum to the 2007 First Reading FOR AGENDA OF 1/30/2013 <br /> Comprehensive Water Plan Second Reading <br /> Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> This is a study covering Two PSAs signed by Public Works <br /> the Water service area of consultant <br /> the City of Everett <br /> Amount Budgeted $250,000 <br /> Expenditure Required $247,998 Account Number(s): UP-3537 <br /> `Budget Remaining $2,002 • <br /> Additional Required -0- . <br /> DETAILED SUMMARY STATEMENT: <br /> The City is on a six-year cycle for updating the Comprehensive Water Plan. The last plan was completed and <br /> approved by the State of Washington Department of Health in January 2008. The City needs to begin the <br /> planning process now to have an approved and adopted document by January 2014.HDR Engineering, Inc. <br /> performed the original 2007 plan and was selected from the existing utilities' roster to conduct the <br /> addendum. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Mayor to Sign a Professional Services Agreement with HDR Engineering,Inc.to Provide <br /> Engineering Services for the 2007 Comprehensive Water Plan Update in the amount of$247,998. <br /> 3 <br />