My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/01/30 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/01/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 11:33:05 AM
Creation date
5/22/2017 11:32:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/30/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Professional Services . Briefing COUNCIL BILL# <br /> Agreement with HDR Proposed Action Originating Department Public Works <br /> Engineering,Inc. to Provide Consent Contact Person Souheil Nasr <br /> Engineering Services for the Action Phone Number (425)257-7210 <br /> Addendum to the 2007 First Reading FOR AGENDA OF 1/30/2013 <br /> Comprehensive Water Plan Second Reading <br /> Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> This is a study covering Two PSAs signed by Public Works <br /> the Water service area of consultant <br /> the City of Everett <br /> Amount Budgeted $250,000 <br /> Expenditure Required $247,998 Account Number(s): UP-3537 <br /> `Budget Remaining $2,002 • <br /> Additional Required -0- . <br /> DETAILED SUMMARY STATEMENT: <br /> The City is on a six-year cycle for updating the Comprehensive Water Plan. The last plan was completed and <br /> approved by the State of Washington Department of Health in January 2008. The City needs to begin the <br /> planning process now to have an approved and adopted document by January 2014.HDR Engineering, Inc. <br /> performed the original 2007 plan and was selected from the existing utilities' roster to conduct the <br /> addendum. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Mayor to Sign a Professional Services Agreement with HDR Engineering,Inc.to Provide <br /> Engineering Services for the 2007 Comprehensive Water Plan Update in the amount of$247,998. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.