Laserfiche WebLink
Tawn a Herman <br /> From: Shellie Pons <br /> Sent: Thursday, March 17, 2016 8:32 AM <br /> To: Tawnya Herman; Terri Jorgenson <br /> Subject: FW: fred meyer <br /> Not sure what to do with this. <br /> �tt�of�veaett, ��. <br /> CP[umbin.q/C/`lechanica!ln5,o. <br /> 425-257-7274 <br /> �eon.6@evetettwa.gov <br /> From: Charles Johnstone <br /> Sent: Thursday, March 17, 2016 8:20 AM <br /> To: Shellie Pons <br /> Cc: Darold Walden; Jeff Kerwin <br /> Subject: RE: fred meyer <br /> If they can't connect to a grease waste line in the store then yes we'll have them put in a trap. I met Darold at the (back <br /> from Haagen) Safeway at 7601 Evergreen yesterday where they're putting in a Starbucks too. Like the other Starbucks <br /> remodels, we are having them put in a 20 or 25 gpm trap. They seem to like those Schier units and I told the plumbing <br /> sub it should have a two way cleanout or some way to see the outflow on discharge side. This one was still at ground, is <br /> likely most like the one done at Target where they put in a G1350. We don't expect anywhere near the production out of <br /> these in-store kiosks vs.the cafes with drive through lanes (across street from 7601). <br /> Thanks. <br /> C <br /> X8224 <br /> *BTW,just the other day I was thankful for that two way cleanout at the Jersey Mikes over at Claremont.They already <br /> had the trap cleaned before I could see it, but view into the discharge line told the tale... <br /> 1 <br />