Laserfiche WebLink
INSP CTION REPORT <br /> 1 c (� — <br /> Date: ` � Permit: �o`� v ,9 <br /> Contractor: l <br /> Owner: <br /> 1 <br /> Site AddreS Cif� <br /> F INSPECTION REQUESTED <br /> ELECTRI BU��PE <br /> tKT MECHANICAL IBING <br /> ❑Temp S ice ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough Intura)Slab ❑OK to insulate ElOK to insulate <br /> ❑Service Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding on ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final �❑l HWT Final / (� <br /> OTHER OR CONSULTATION: „! ✓ �O <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F-1OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> AJ <br /> Inspector: Q/; Date: <br /> EIR(4/09) L NAT_" FORMS&PROMOTIONS•425/406-6400 <br />