My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11323 EVERGREEN WAY 2017-05-23
>
Address Records
>
EVERGREEN WAY
>
11323
>
11323 EVERGREEN WAY 2017-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2017 1:56:41 PM
Creation date
5/23/2017 1:56:39 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11323
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Provisions for <br /> Highway Encroachments <br /> Permit No. 50655 <br /> Applicable provisions are denoted by <br /> ® 1. No work provided for herein shall be performed until the Permit Holder is authorized by the following Department representative: <br /> Mike Gallop, Const. Representative <br /> gallopm@wsdot.wa.gov <br /> Office 206-440-4913 <br /> Cell 206-940-2736 <br /> 02. Prior to the beginning of construction,a preconstruction conference shall be held at which the Department and the Permit Holder and Permit Holder's <br /> engineer,contractor,and inspector shall be present. <br /> ® 3. Should the Permit Holder choose to perform the work outlined herein with other than its own forces,a representative of the Permit Holder shall be <br /> present at all times unless otherwise agreed to by the Department representative. All contact between the Department and the Permit Holder's <br /> contractor shall be through the representative of the Permit Holder. Where the Permit Holder chooses to perform the work with its own forces,it <br /> may elect to appoint one of its own employees engaged in the construction as its representative. Failure to comply with this provision shall be <br /> grounds for restricting any further work by the Permit Holder within the State right of way until said requirement is met. The Permit Holder,at its <br /> own expense,shall adequately police and supervise all work on the above described project by itself,its contractor,subcontractor,agent,and <br /> others,so as not to endanger or injure any person or property. <br /> ® 4. A copy of the permit must be on the job site and protected from the elements at all times during any of the construction authorized by said permit. <br /> 05. This permit does not give the Permit Holder or any agent or contractor of the Permit Holder any rights to cut,spray,retard,remove,destroy, <br /> damage,disfigure or in any way modify the physical condition of any vegetative material located on the highway right of way,except by written <br /> permission from the Department or for purposes as described by No.6 if denoted below. All restoration shall be done to the satisfaction of the <br /> Department at the sole expense of the Permit Holder. <br /> ® 6. If necessary to increase sight distance,brush shall be removed from both sides of the access connection and stumps shall be removed. <br /> The indiscriminate cutting of merchantable timber or disfiguring of any feature of scenic value shall not be permitted. <br /> ® 7. The access connection(s)shall be constructed in accordance with the attached WSDOT approved template <br /> Sufficient length of diameter culvert pipe shall be placed in ditch and laid to a true line and grade. <br /> The access connection(s)shall be surfaced to the limits as shown on the plan with a 150 millimeter(6 inch)minimum compacted depth of gravel <br /> base material and a 80 millimeter(3 inch)compacted depth of crushed surfacing top course. Asphalt paving will not be required.Finished grade <br /> of the access connection shall be in accordance with the profile control as shown on the attached plan.Directing of surface water from private <br /> property to Department right of way will not be permitted,unless otherwise approved by the Department. <br /> 8. The access connection(s)shall be constructed in accordance with the attached <br /> Sufficient length of diameter culvert pipe shall be placed in ditch and laid to a true line and grade. <br /> The access connection(s)shall be surfaced to the limits as shown on the plan with a 150 millimeter(6 inch)minimum compacted depth of gravel <br /> base material,a 80 millimeter(3 inch)minimum compacted depth of crushed surfacing top course,and paved with a 80 millimeter(3 inch) <br /> minimum compacted depth of Asphaltic Concrete Class B unless otherwise specified by the Department. Any existing oil mat on shoulder or <br /> roadway shall be removed and new pavement laid to a butt joint with existing pavement. Finished grade of new pavement shall be in accordance <br /> with the profile control as shown on attached plan. Directing of surface water from private property onto Department right of way will not be <br /> permitted,unless otherwise approved by the Department. <br /> (09. All buildings and appurtenances shall be so located at a distance from the right of way line of any State Highway that none of the right of way <br /> therefore is required for use of the patrons or customers of any such establishment. Permit Holder shall comply with local building codes. Set-back <br /> requirements for the location of buildingts in relation to the right of way line are a function of local authorities,and they should be consulted <br /> regarding requirements that must be adhered to. <br /> RAMPS-Special Provisions-Pagel Page 1 3 ' i Exhibit „A„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.