Laserfiche WebLink
PLUG & ABAN EX 8" CMP EX WATER SPIGOT �'0 EAST WATERWAY <br /> PERF PIPE, SEE NOTE 1 (SAVE & PROTECT) EX SDMH, SEE SHT C3.3 FOR REPAIR <br /> DETAILS (SAVE & PROTECT) -- -12 <br /> TOP OF SOIL GROUT TO <br /> -STOP AT ELEV 11' WITHIN PLUG & ABAN EX 8" CMP REMOVE AND REPL UPPER 5' OF SOIL WITHIN <br /> LIm1-TS OF 12" SD TRENCH. %' PERF PIPE, SEE NOTE 1 5' HORIZ OF BULKHEAD, SEE NOTE 3. <br /> 36' <br /> DEMO & REPL <br /> REMOVE AND REPL UPPER 5' OF SOIL WITHIN i SUBG EX 2" W, SEE C4.0 <br /> 5' HORIZ OF BULKHEAD, SEE NOTE 3. • _„% Rq�e IMpRO�f EX POWER CONDUIT SEAL FACE OF BULKHEAD WITH <br /> EX POWER CONDUIT 4tEIMPERMEABLE BARRIER AS <br /> j�T <br /> J PROTECT)AND(SAVE NECESSARY TO PREVENT LEACHING <br /> o�F <br /> �__ (SAVE AND PROTECT) , • S CT, 1� \ I OF GROUT INTO THE EAST WATERWAY. <br /> EX 12" SD OUTFALL``--� - • <br /> (5), IE=-2.25' �� y 0 a N - 8" <br /> o y <br /> EX 24" SD cin " EX SHEET PILE <br /> OUTFALL , v WALL BULKHEAD EX MONITORING WELL <br /> MANIFOLD �� • (SAVE & PROTECT) <br /> -2 Q <br /> 9 ' <br /> � � • ��` PSP � �� <br /> EX WATER SPIGOT <br /> 0 *. • ti <br /> If _ _ <br /> • ` • ^u (SAVE & PROTECT) <br /> 0 <br /> T_�- v <br /> AP.PROX C'ROQT INJECTION, c5. CSO�s <br /> X" POINT LOCATION, TYP. ` <br /> /:- SEE NO 2: o„ / APPROX LIMIT OF EX <br /> �-DEMO & REPL `\ /� / r _ g <br /> SOIL SUBSIDENCE <br /> .c� • <br /> s EX 2" W, SEE C4.0 EX ASPH h • i <br /> AROUND WATER SPIGOT <br /> ` 6 ` <br /> / F( _1--APPROX GROUT INJECTION <br /> / <br /> SAWCUT LIMIT LINE, 30- POINT LOCATION, TYP. <br /> \ SAWCUT. LIMIT LINE, SEE SHEET C3.0 CMA S0 6,t fX / SEE NOTE 2. <br /> SEE SHl':C3.0 FOR _ _ FOR EXTENTS (S �� 2 <br /> FILL ANY VOIDS FOUND DURING WATER qW�S l <br /> EXTENTS "'�LINE REPLACEMENT. GEOTECH TO BBQ <br /> ON--SITE TO OBSERVE AND PROyfDE pR <br /> RECOMMENDATION. ' QCT) 'To <br /> RECOMMENDATION. <br /> GROUT INJECTION ELEVATION TABLE <br /> PLAN NOTES: <br /> GROUT INJECTION APPROX GROUND SOIL GROUT SOIL GROUT <br /> SCALE: 1"=5' 1. PLUG & ABAN EX 8" CMP PERF PIPE (2) WITH PRESSURIZED POINT SYMBOL SURFACE ELEV TOP ELEV* BOTTOM ELEV <br /> INFLATABLE BLADDER. SEE DETAIL 1, SHEET C3.3. <br /> 2. THE HORIZONTAL AND VERTICAL LOCATIONS OF THE GROUT • +18.0' +13.0' +0.0' N <br /> INJECTION POINTS AS SHOWN ON THIS PLAN ARE INTENDED FOR <br /> ILLUSTRATION PURPOSES ONLY. IT IS THE CONTRACTOR'S ❑• +18.0' +13.0' +4.0' <br /> RESPONSIBILITY TO FIELD LOCATE THE GROUT INJECTION POINT <br /> LOCATIONS SUCH THAT THE WORK DOES NOT DAMAGE THE EXISTING Q +18.0' +13.0' +6.0' <br /> BULKHEAD TIE-RODS. THE CONTRACTOR SHALL PREPARE A SOIL <br /> GROUTING WORK PROCEDURES PLAN IN CONFORMANCE WITH THE *TOP OF SOIL GROUT SHALL BE TERMINATED AT A DEPTH OF 5-FEET <br /> SPECIFICATIONS THAT DESCRIBES THE CONTRACTOR'S METHOD TO FROM THE SURFACE OF THE FINAL GRADE AS SHOWN ON THE DRAWINGS. <br /> PROTECT THE EXISTING TIE-RODS AND TO PROTECT THE EXISTING EXCEPT, AT LOCATIONS WHERE UTILITY PIPES ARE DEEPER THAN 5-FEET <br /> 24" AND 30" STORM DRAIN PIPES FROM DAMAGE AND FROM FROM THE SURFACE, THE GROUT SHALL TERMINATE AT THE BOTTOM OF <br /> INTRUSION OF GROUT. THE WORK PROCEDURES PLAN SHALL BE THE UTILITY TRENCH. <br /> SUBMITTED TO THE PORT AND TO THE PROJECT ENGINEER NO LESS <br /> THAN 2 WEEKS PRIOR TO START OF WORK. <br /> 3. REMOVE & REPLACE THE UPPER 5' OF SOIL WITHIN 5' HORIZONTAL LEGEND <br /> OF BULKHEAD AND MANHOLE TO IMPROVE THE PAVEMENT __ ASPHALT SAWCUT LIMIT LINE <br /> SUBGRADE AS SHOWN ON THE PLAN. BACKFILL AND RECONSTRUCT 5' 0 5' 10' <br /> PER DETAILS A & B, SHT C5.1 AND PER THE SUPPLEMENTAL OVER-EXCAVATION AREA TO <br /> CALL 48 HOURS GEOTECHNICAL TECHNICAL MEMORANDUM PREPARED BY LANDAU IMPROVE PAVEMENT SUBGRADE <br /> ASSOCIATES DATED JULY 17, 2015. DO NOT OPERATE LARGE 2.5' 7.5' <br /> BEFORE YOU DIG COMPACTION EQUIPMENT WITHIN 5' OF BULKHEAD AND MANHOLE. SCALE: 1"=5' <br /> DIAL 811 EX STEEL TIE-ROD <br /> (SAVE & PROTECT) NOTE: FULL SIZE IS 22" x 34" <br /> PROJECT ENGINEER: SCALE: DWG. NO. <br /> rr Nle D. GATES 1 5' <br /> �4 PORT OF EVERETT C5.0 <br /> q� r " = <br /> �'pFL'��-i DESIGNED BY: DATE' <br /> Port of ` J. BECKER 7/27/2015 D U N L A P BULKHEAD <br /> N0.1-0-015-01 <br /> �4 ain I�I <br /> EVERM ' } DRAWN BY; CHECKED BY: RENOVATION Y <br /> `'�' J. PR BECKER D. GATES PROJECT <br /> 7/27/15 XXX ISSUED FOR BID. APPROVED BY: <br /> P.O. BOX 538 1601 Sth Avenue,Suite 1300 °° SOIL GROUTING & GROUND NO. MT-HT-2015-06 <br /> QO A <br /> EVERETT, WA 98206 Seattle,Washington 98101 � � K <br /> (425) 259-3164 (206)382-MO Fax(206)382-0600 IMPROVEMENT PLAN SHEET NO. 12 OF 23 <br /> N0. DATE BY REVISION N0. DATE BY RE�i=:�� <br />