My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/01/09 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/01/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 10:45:22 AM
Creation date
5/24/2017 9:44:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to Ordinance No. <br />Central Waterfront Redevelopment. Plan � <br />Permitted uses are identified subject to the further requirement that uses in the shoreline <br />jurisdiction be water -dependent, an incidental part of a water -dependent use, or water -oriented. <br />Prohibited uses otherwise allowed in the M-2 zone are also identified. <br />• The only obvious water -dependent uses that are prohibited are fish cleaning and <br />processing, and coal exporUshippinig. Fish processing was identified in our report as a <br />viable use, but would only occupy a portion of the site. <br />• The prohibited uses that aren't water -dependent and might otherwise be acconnnodated <br />are the kinds of "low compatibility" uses that are typically strongly regulated in an urban <br />area. No viable uses identified in our report are included in the prohibited list. <br />• A wide variety of manufacturing uses are permitted as well as business parks, and <br />commercial uses serving other area businesses. <br />The analysis of the Preferred Alternative also addressed the potential for on-site public access, <br />impacts on the Port of Everett and to downtown, finding the following: <br />Public Access: Public access within the shoreline jurisdiction is strongly encouraged on-site <br />where such access is not in conflict with water -dependent uses, and required on-site for non <br />water -dependent uses. The regulations provide flexibility in providing public access in the <br />shoreline zone without compromising operations on-site. <br />Impacts on Port of Everett and Downtown: Any new uses for the site would be incompatible <br />with the Port if they interfered with Port operations. This is unlikely as the allowable uses and <br />development regulations would provide for similar activities to what already occurs at the Port. <br />As noted above, the public access requirements shouldn't compromise operations on the site <br />itself and certainly wouldn't on adjacent properties. <br />As noted in our report, benefits to Downtown are greatest with a high employment density on- <br />site and attractive views and amenities for Downtown residents and workers. The vision for high <br />quality water dependent and non water -dependent uses with a goal of 10 or more employees per <br />acre should result in such benefits to Downtown. <br />The economic analysis concludes: In summary, the preferred alternative recognizes the unique <br />characteristics of the site, allows for viable uses, encourages high quality development, and will <br />not limit productive use of properties in the area. Further, it should provide benefits for the <br />Downtown without adversely affecting the Port. (See letter from Property Counselors dated <br />October 8, 2012, in Appendix 7). <br />25 <br />123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.