Laserfiche WebLink
INSPECTION REPORT <br /> eTr Date ZZ \ Per-it: C)G <br /> Contractor: _��'I�S�YOV�— �_ <br /> k,,,' C.(� �/ Owner: �_ <br /> Site A ess: <br /> TYPE OF INSPECTION REQUESTED <br /> XELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> WGrou ing ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Grid ❑Drywall Nailing ❑Plumbing Final <br /> cal Final ❑Shear Nailing GAS PIPERK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: "l ZS 2—S2- V <br /> �APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> cK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> LV 9N <br /> Inspector: Date: — <br /> EIR(10/06) D ABAR,INC. <br />