Laserfiche WebLink
3 <br /> FIRE ADMINISTRATION COMPLEX <br /> SEISMIC IMPROVEMENTS <br /> Change Order No.Two-Exhibit A <br /> No. Construction Change Directives <br /> 5 Plumbing modifications at multiple locations $ 13,780.35 <br /> 8 Additional Excavation&Concrete at Shear Walls $ 34,480.35 <br /> 9 Repairs for seismic work access at Office 002&004 $ 7,078.54 <br /> 12 Wall Changes at Hall 201, Restroom 008, Boiler 011 $ 5,561.70 <br /> 13 Ceiling revisions at Offices 105, 106, 107&109 $ 9,905.42 <br /> 15 Roof hatch at Storage 209A $ 11,986.61 <br /> 16 Demo East Wall Plaster in Kitchen 213 $ 4,633.12 <br /> 17 Demo Paneling &Plaster in Office 202,204&212 $ 8,152.45 <br /> 22 2801 fire alarm system $ 65,677.44 <br /> 23 Infill roof access door $ 1,578.66 <br /> 26 Demolish 2nd Floor lath &plaster ceiling $ 11,375.03 <br /> No. Biwell Construction Change Request <br /> 1 Reinforce beam cut for door opening in basement $ 463.48 <br /> 2 Infill floor structure at second floor toilet room area $ 1,074.33 <br /> 3 Rip Beam&Add LTP4 Plates in Place of Bolts $ 320.52 <br /> 5 Head off plumbing vent, rebuild wall and remove timber $ 1,314.85 <br /> 6 Add framing at west clay tile roof $ 753.50 <br /> 7 Add framing&structural steel at north/south clay tile roof $ 11,828.41 <br /> 8 Repair section of missing beam at front door $ 2,400.94 <br /> 10 Relocate mop sink vent $ 907.02 <br /> TOTAL $193,272.72 <br /> 10 <br />