Laserfiche WebLink
INSPECTION REPORT ((3 L�&L77- <br /> Date: \ Permit: <br /> Contractor: <br /> Owner: LOr! <br /> Site Address: 2 4 OAr <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> tTE ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> Grid ❑Drywall Nailing ❑ Plumbing Final <br /> cal Fi at ❑Shear Nailing GAS PIPE <br /> RK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> rains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains [:1 Building Final h Gas Pipe Final n HWT Final <br /> OTHER OR CONSULTATION: 4zS <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> E] OK FOR T.C.O. F1 CORRECTION REQUESTED <br /> F-1OKFOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ 9 <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice recfTi red <br /> Inspector: Date: l 7 <br /> EIR(4/09) !C NA7(._ 1<()MOTIONS•423/4118-89410 <br />