Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: <br /> Contractor: <br /> Owner: <br /> Yl�t, i <br /> SiteAddress: ►/TI � i <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing a Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation /��j Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing Ll Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid refrigeration L1 Rough In <br /> F-1Roofdrains ❑Building Final Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: l e— <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> O R T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector Date: /tC.' <br /> FIR(VO' <br />