Laserfiche WebLink
Benyam Stephanos <br /> From: Tim Slotta [ts4sdc@hotmail.com] <br /> Sent: Thursday, March 03, 2011 2:12 PM <br /> To: Benyam Stephanos <br /> Subject: Nelson Highland Figures 3-1-11 <br /> Attachments: Figure 1[1].pdf; Fig 2 Rev.TIF; Figure 3[1].pdf <br /> Benyam, <br /> Attached are the figures (3) that were reviewed by Jane for installation of the oil stop valve at the Nelson Highland <br /> Facility. The total estimated cost for this project is <br /> $ 6,700. Give me notice when the permit is prepared, and I will bring you a check. <br /> Thank you, <br /> Tim Slotta, L.G., L.H.G., L.E.G. <br /> Hydrogeologist <br /> SD&C <br /> O: 206.459.5775 <br /> ts4sdc(@hotmail.com <br /> i <br />