Laserfiche WebLink
9/8/2016 Page 2 <br /> 8:23:59AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> 5/14/2001 5/14/2001 Framing KBJ PartialAppro Partial inspect.,see Partial inspection <br /> notes 1-Check nail/bolt pattern on A-2 truss <br /> 2-Provide engineering on midified trusses <br /> above stairs-provide hangers <br /> 3-Check bearing of trusses at entry <br /> 4-Privide revised upper floor plan <br /> 5-Fireblock top of vent chases,etc... <br /> 6-Complete upper flooe shear walls <br /> 6/1/2001 6/1/2001 Framing KBJ PartialAppro Reinspect,see notes Provide revised plans for all floor plan <br /> changes-engineering must approve <br /> 6/29/2001 6/29/2001 Framing TMB PtAppr-CorrR See notes 1-Nail off trusses at hangars <br /> 2-Provide correct truss hangars at girder <br /> truss <br /> 3-Nail off joist hangar <br /> 4-Garage and basement not part of this <br /> inspection <br /> Ok to insulate,1st and 2nd floor walls <br /> 7/23/2001 7/23/2001 Consultation KBJ Corr Reqd See notes 1-Provide re-engineering of shear walls <br /> 2-Tempered glass required at tubs <br /> 3-All enclosed spaces require fireblocking <br /> 4-Mechanical/plumbing and electrical <br /> rough-ins required <br /> 5-Step required down to living room <br /> 6-Main stairs to have equal risers(3/8 <br /> max) <br /> 7-Repair trusses at entry-add hangers to <br /> trusses above main stairway <br /> 8-Fireblock at dropped ceiling lines <br /> 9-Hanger and lag ledger at dick <br /> 10-Strap beams,plates,etc...in garage <br /> 8/30/2001 8/30/2001 Framing KBJ PartialAppro See notes 1)Main floor,pantry wall,fire block. <br /> 2)Header above door off entry(office). <br /> 3)Fireblock alcove in office. <br /> 4)Fireblock at basement stairs. <br /> 5)6"min tread width at basement stairs. <br /> 6)Connect posts&hangers in crawl space. <br /> OK to insulate. <br /> 9/5/2001 9/5/2001 InsulBldg KBJ Approval As noted,see notes Insulate walls behind gas heater with vapor <br /> barrier(not Kraft papaer) <br /> Note:insulate crawl space floor <br /> 9/19/2001 9/19/2001 DrywallNailing KBJ Approval <br /> 10/2/2001 10/2/2001 DrywallNailing KBJ Approval <br /> 10/2/2001 10/2/2001 InsulBldg KBJ Approval <br /> 12/17/2001 12/17/2001 Consultation KBJ Other See notes 1-Complete gutters,downspouts siding <br /> etc... <br /> 2-Landing and handrails required at entry <br /> door <br /> 3-Complete rails at stairs <br /> 4-Cover upstairs deck <br /> 5-Rear stairs from deck-rise and handrail <br /> 6-Stairs to basement-6"minimum width <br /> 7-Box in garage wall plumbing pnetration <br /> 8-Guardrail at driveway edge <br /> 9-Complete electrical,plumbing,and <br /> mechanical finals <br /> 12/19/2001 12/19/2001 Final Plbg DTW Corr Reqd See notes Caulk around all plbg pipe <br /> Relief line to have peeper grade to outside <br /> Complete dishwasher <br /> Caulk around all tub trim <br /> Complete toilet seats <br /> 12/24/2001 12/24/2001 Final Plbg DTW Approval See notes Plbg final ok <br /> As noted,complete relief line outside, <br /> minimum 6",max 24"of grade <br /> Complete dishwasher hose clamp <br /> Complete fix on faucet in lower bath <br /> 2/28/2002 2/28/2002 Final Bldg KBJ PtAppr-CorrR See notes Mechanical final required <br /> 1-Handrail at front stairs and rear stair <br /> 2-Basement stairs less than 6"tread <br /> INSP12 CAWSYSTEMS <br />