Laserfiche WebLink
INSPECTION REPORT <br /> Date: �� 10 Permit: 1 V00 <br /> �D ontractor: <br /> 9dress: Owner: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILD <br /> I G MECHANICAL PLUMBING <br /> F-1 Temp Servic d ❑Groundwork/Slab ElGroundwork/Slab <br /> Ll Groundwork' ting El Rough In El Rough In <br /> ElSlab/Conduit oundation Ceiling Grid El Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration CJ Rough In <br /> ❑Roof drains ❑Building Final ❑nGas <br /> �Pipe Final <br /> ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> OVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: D <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 4 Non <br /> rj <br /> Y <br /> Inspector: yam,! ` Date: /6 <br /> EIR(4/09) XSic nnT_RE FORMS x raoMonoN' <br />