Laserfiche WebLink
I <br /> The Contractor shall review its responsibilities under Chapter 19.122 RCW, a law relating to <br /> underground utilities. Cost to the Contractor incurred as a result of complying with this law <br /> shall be at the Contractor's expense. In accordance with RCW 19.122, the Contractor shall call <br /> the Utility Coordinating Council One Call Center, 1-800-424-5555, for field location, not <br /> less than 2 nor more than 10 business days before the scheduled date for commencement of <br /> excavation that may affect underground utility facilities, unless otherwise agreed upon by the <br /> parties involved. A business day is defined as any day other than Saturday, Sunday, or a legal <br /> local, State,or Federal holiday. <br /> The Contractor shall be responsible for determining the exact location, including service <br /> connections, of all public and private underground utilities marked at the site of the Work. <br /> Perform field verification prior to beginning Work that could result in damage to buried <br /> utilities, including but not limited to exploratory excavations, in sufficient time so as not to <br /> impede the progress of the Work or fabrication of materials to be incorporated into the Work. <br /> The Contractor shall immediately notify the City's Representative as to any utility discovered <br /> by him in a different position than shown on the Plans or that is not shown on the Plans. <br /> No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so.Failure of the City to <br /> show the existence of subsurface objects or installation on the Plans shall not relieve the <br /> Contractor from its responsibility to make an independent check on the ground, nor relieve <br /> Contractor from all liability for damages resulting from its operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the agencies <br /> that have utilities in place and to coordinate with these agencies in the protection and relocation <br /> of the various underground installations. These agencies will give assistance in the location of <br /> the various utilities, but this shall not relieve the Contractor from responsibility for any damage <br /> incurred.The City shall require a notification of at least five working days. The Contractor shall <br /> hold the City harmless against any claim of any nature resulting from Delays in attending to <br /> same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Snohomish County PUD#1 Puget Sound Energy <br /> PO Box 1107 PO Box 97034 BOT-01G <br /> Everett,Washington 98206 Bellevue, WA 98009-9734 <br /> Attn: Erin Burke Attn: Lisa Griffith <br /> Tel. (425)783-4745 Tel. (425)424-6472 <br /> Email: EFBurke@SNOPUD.com Email: lisa.griffith@pse.com <br /> Frontier Communications NW CenturyLink Network <br /> Attn: Tim Rennick 1208 NE 64th Street,Rm 401 <br /> MC WA0104OS Seattle,WA 98115-6722 <br /> 1800 40 St Attn: Jack Johnson <br /> Everett, Washington 98201 Tel. (206)345-0230 <br /> Tel.(425)263-4025. <br /> Email: tim.rennick@ftr.com <br /> I <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 89 <br />