My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> , <br /> isNote: Unit prices for all items,all extensions,and the total amount bid must be shown.Where conflict occurs between the <br /> unit price and the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform <br /> thereto.All entries must be typed or entered in ink. <br /> BID SCHEDULE <br /> II <br /> BIDDER: X, L. AL.IA (./ <br /> dr3'li°R- I <br /> I <br /> TOTAL <br /> I ITEM UNIT PRICE AMOUNT <br /> NO. PLAN QUANITY ITEM DESCRIPTION (Figures) (Figures) <br /> I I EST Force Account $ i I O i br3GM $ 110%0°6-* <br /> 1O%0°6f <br /> I' 2 I LS Surveying $ ‘016d5- $ 10,66(5 <br /> 3 1 LS Spill Prevention,Control and <br /> I <br /> Countermeasures Plan $ U t30 $ \ OOC�- <br /> 4 I LS Mobilization $1.ZSi066- $Z7,5irte- <br /> 5 <br /> 3,040 HR Traffic Control Labor S -5°1- $ 11�SrSCo6,- <br /> 6 1 LS Maintenance and Protection of Traffic Control $ 5,0m- $ 5,o0©" <br /> 7 2,600 SY Roadway Excavation,Including Haul $ IC" $ -7_(o000,. <br /> 8 4,170 TN Gravel Borrow, Including Haul $ j $ P010- <br /> 9 <br /> 19 730 TN Foundation Material $ 8 - $ 130- <br /> ITI10 90 HR Street Cleaning and Sweeping $ 1 i_1(�- $ i 1, 6 <br /> 11 I LS Shoring or Extra Excavation,Class A $ 1.0,000- $ z),060" <br /> 12 3,140 TN Crushed Surfacing Base Course $ .31 ... $ 116, 1 gC3- <br /> I13 520 TN HMA CL 'h"PG 64-22 $ LU- $ c z. WIC <br /> I 14 125 TN Temporary Pavement Patch,2-inch HMA $ 1 O- $ i 11.c� <br /> 15 I LS Trunk C Connection and Flow Modifications- <br /> Siphon Headworks Structure $ -in,©`0,60 l^ $ t ,vmQ_ <br /> 16 1 LS Siphon Headworks Entry-Structure Demolition $ ..78i0 $ iU,oto^ <br /> and Flow Meter Structure $ - $ CO)066- <br /> _ 0©p <br /> 17 1 LS Siphon Pipe Inspection j00,Opp 5 <br /> 1 18 I LS SRO 1 Regulator Structure $ 1081080- $ '16a+Od <br /> 19 1 LS SRO $Regulator Structure 1 by I 6d0 $ 1 Q a c Ot6' <br /> 20 1 LS Trunk C Flow Screening Structure $ 1438( WO' $ 1 O u6(f- <br /> t HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS(SRO',SRO2, AND SRO3) <br /> WO No-UP3398-31 SP- 5 <br /> lige 13 Bid Schedule <br /> ovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwacom-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.