My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> roadway, sidewalk, and path the City will do the Work and deduct all resulting costs from <br /> payments due to the Contractor. <br /> If the Engineer determines that the Contractor has pursued the Work diligently before the <br /> suspension,then the City will maintain the temporary roadway, sidewalk,and path(and bear its <br /> cost).This City-provided maintenance work will include only routine maintenance of: <br /> 1. The Traveled Way,Auxiliary Lanes, Shoulders,detour surface,sidewalks,and paths, <br /> 2. Roadway drainage along and under the traveled Roadway,sidewalk,path or detour, <br /> and <br /> 3. All barricades,signs,and lights needed for directing traffic through the temporary <br /> Roadway, sidewalk,path or detour in the construction area. <br /> The Contractor shall protect and maintain all other Work in areas not used by traffic. All costs <br /> associated with protecting and maintaining such Work shall be the responsibility of the <br /> Contractor except those costs associated with implementing the TESC Plan according to <br /> Section 8-01. <br /> After suspension during which the City has done the routine maintenance, the Contractor shall <br /> accept the traveled Roadway, sidewalk, path or detour as is when Work resumes. The <br /> Contractor shall make no claim against the City for the condition of the Roadway or detour. <br /> After any suspension, the Contractor shall resume all responsibilities the Contract assigns for <br /> the Work. <br /> 1-08.8 Extensions of Time <br /> Delete the first and second sentences in the second paragraph of 1-08.8. <br /> Supplement 1-08.8 by adding the following: <br /> Any requests for extensions in Contract Time, whether resulting from Extra Work directed by <br /> the City or not,shall be accompanied by an analysis of schedules using the critical path method. <br /> This analysis shall include an updated schedule, an as-planned schedule, an as-built schedule, a <br /> but-for schedule, and narrative explaining the alleged causes, schedule impacts and all costs <br /> related to or arising out of the proposed extension. Any requests for extensions of Contract <br /> Time by the Contractor shall be submitted in accordance with these Contract Documents. <br /> Extensions of Contract Time will be granted only as provided in the Contract Documents and to <br /> the extent that affected critical activities exceed the Total Float time along the affected paths of <br /> the reviewed Preliminary Schedule at the time the change was authorized in writing by the City. <br /> Contractor has the burden of clearly and convincingly demonstrating entitlement to any <br /> adjustment of Contract Time. <br /> If the City is solely responsible for any Delay to Substantial Completion, Physical Completion, <br /> Completion Date, or Final Acceptance, the Contractor shall only be entitled to compensation or <br /> other damages as described in 1-09.11A REMEDIES, provided that Contractor timely gave <br /> Notice pursuant to 1-04.5 NOTICE BY CONTRACTOR, timely submitted a Contract Claim <br /> pursuant to 1-09.11(2) CONTRACT CLAIMS and fulfilled the requirements of 1-08.3 <br /> PROGRESS SCHEDULE. <br /> 1-08.9 Liquidated Damages <br /> Delete the defmition for"T" in the Liquidated Damages Formula and substitute the following: <br /> T = original time for Substantial Completion <br /> Delete the fourth sentence of the fourth paragraph of 1-08.9 and substitute the following: <br /> For overruns in Contract Time occurring after the Physical Completion Date, liquidated <br /> damages shall be assessed at the rate of ten(10)percent of the amount computed by the formula <br /> in this section until the actual Physical Completion Date of all the Contract Work. <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.