My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. If additional compensation is sought, the exact amount sought and a breakdown , <br /> of that amount into the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a <br /> Contract Claim is made or in the absence of actual cost, the rates <br /> established by the AGC/WSDOT Equipment Rental Agreement that was in <br /> effect when the Work was performed. In no case shall the amounts sought <br /> or paid for each piece of equipment exceed the rates established by the <br /> Equipment Rental Agreement even if the actual cost for such equipment is <br /> higher. The City may audit the Contractor's cost records to determine <br /> actual equipment cost. The following information shall be provided for <br /> each piece of equipment: I <br /> i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar <br /> 12 "G,"Tractor Crawler ROPS and Dozer Included Diesel, etc.); <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job overhead; <br /> v. Overhead(general and administrative); <br /> vi. Subcontractor's Contract Claims (in the same level of detail as <br /> specified herein is required for any subcontractor's Contract Claims); <br /> and <br /> vii. Other categories as specified by the Contractor or the City. <br /> 10. A notarized statement shall be submitted to the City's Representative containing <br /> the following language: <br /> Under the penalty of law for perjury or falsification,the undersigned, I <br /> I(name) (title) <br /> of <br /> (company) I <br /> hereby certifies that the Contract Claim for extra compensation and <br /> extension of Contract Time, if any, made herein for Work on this Contract <br /> is a true and complete statement of the factual basis of the Contract Claim <br /> and all actual costs incurred and time sought, and is fully documented and <br /> supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of ' <br /> Notary Public <br /> My Commission Expires: <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP- 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.