Laserfiche WebLink
I <br /> Iadministrative functions relating to this Contract. The terms"Engineer," "Architect," or"City's <br /> Representative"shall be interchangeable with Owner's Representative. <br /> I Person: Includes individuals, associations, firms, companies, corporations, partnerships, and <br /> joint ventures. <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> I Provide: Furnish and Install,complete in place. <br /> Punch List: List of incomplete items of Work and of items of Work that do not conform to the <br /> requirements of the Contract Documents. The Punch List is prepared after Substantial <br /> I Completion. <br /> RCW: Means the Revised Code of Washington <br /> Schedule of Values: Allocation of Contract Sum to items of Work as described in 1-09.9 <br /> IPAYMENTS of these Special Provisions. <br /> Shall: Required conduct. <br /> Shown: Refers to information presented on the Plans,with or without reference to the Plans. <br /> ISpecifications: Includes 2016 WSDOT/APWA Standard Specifications and latest <br /> Amendments, and all other specifications (including these Special Provisions) for the <br /> prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1-01.3 for <br /> I <br /> Specifications.) <br /> Specify: Refers to information described, shown, noted or presented in any manner in the <br /> I Contract. <br /> Submittals: The information required by the Contract Documents provided by Contractor to <br /> the City's Representative or City. <br /> Total Float: The amount of time a given activity or path of activities may be delayed before it <br /> Iwill affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, <br /> I and equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's <br /> Overhead costs realized by the result of reduced Project or Contractor billings, or both, due to <br /> I any reason whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the Proposal. <br /> Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, including a <br /> I schedule of submittal dates for Working Drawings where specified, which the Contractor must <br /> submit to the Engineer. (This definition replaces the definition in WSDOT 1-01.3 for Working <br /> Drawings.) <br /> I1-02 BID PROCEDURES AND CONDITIONS <br /> 1-02.1 Prequalifications of Bidders <br /> I Delete 1-02.1 and substitute the following: <br /> 1-02.1 Bidder Responsibility Criteria <br /> (******) <br /> I1-02.1(1) Mandatory Bidder Responsibility Criteria <br /> (******) <br /> I Bidder shall meet mandatory responsibility criteria in accordance with RCW 39.04.350(1). The <br /> City may require the Bidder to submit documentation demonstrating compliance with the <br /> criteria under this 1-02.1(1).The Bidder must: <br /> I <br /> HAYES STREET REGULATOR February, 2017 <br /> I AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP-53 <br />