R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order by: signing it; writing a separate acceptance; or by failing to notify the City <br /> immediately in writing that Contractor disagrees with the Change Order and does not intend to <br /> be bound by its terms. <br /> The Contractor waives and is estopped from denying its agreement with any unilateral Change <br /> Order for which the Contractor does not immediately give Notice to the City as provided in 1- <br /> 04.5 NOTICE BY CONTRACTOR in these Special Provisions and submitting a Contract <br /> Claim as provided in 1-09.11(2) CONTRACT CLAIMS in these Special Provisions. A <br /> unilateral Change Order that is not timely protested as provided in this section shall be full <br /> payment and final settlement of all asserted and unasserted Contract Claims for Contract Time <br /> and all costs of any kind, including costs of Delays, inefficiencies and impacts, related to, <br /> arising out of,or resulting from,any Work described in the Change Order. <br /> The Contractor shall obtain written consent of the Surety or Sureties if the City's <br /> Representative requests such consent. <br /> 1-04.4(4) Value Engineering and Cost Sharing <br /> (******) <br /> The Contractor may submit proposals for changing the Plans, Specifications, or other <br /> requirements of the Contract Documents and the City, in its sole discretion,may accept or reject <br /> such proposals. If accepted by the City and if the proposal decreases the direct, actual costs of <br /> constructing the Work, the Contract Sum shall be reduced by fifty percent(50%) of the direct, <br /> actual construction cost saved. Because the City has the sole discretion whether to consider, <br /> accept or reject the Contractor's proposal and the Contractor has no right to require the City to <br /> consider or accept such proposals, the City's decision is not reviewable by any court. This <br /> subsection applies only to change proposals initiated solely by the Contractor, or its <br /> Subcontractors and suppliers, and does not apply to change proposals requested or initiated by <br /> the City or the City's Representative. The City is not obligated or required to consider any <br /> Contractor initiated change proposals and may, in its sole discretion, refuse to do so. Under no <br /> circumstances shall the Contractor be entitled to additional compensation arising out of, or <br /> related to,the City's refusal to consider or approve a Contractor initiated change proposal. The <br /> Contractor shall do none of the following without the express written agreement of the City: <br /> fail to perform any Work; commence Work on proposed change; reduce its resources assigned <br /> to performance of the Work in order to prepare a change proposal or in anticipation of approval <br /> of a change proposal; adjust or change the project schedule or take action or fail to take action <br /> that would affect the Completion Date of the Work; take action or fail to take action arising out <br /> of the Contractor's change proposal that would result in the Contractor seeking an adjustment <br /> upward of the Contract Sum. <br /> 1-04.5 Procedure and Protest by the Contractor <br /> Delete 1-04.5 and substitute the following: <br /> 1-04.5 Notice by Contractor <br /> (******) <br /> 1-04.5(1) When Notice Must Be Given <br /> Whenever: <br /> 1. The Contractor disagrees with any requirement,direction, interpretation or <br /> determination by the City or City's Representative; <br /> 2. The Contractor knows, or should with the reasonable exercise of ordinary care know, <br /> of a differing site condition as provided in 1-04.7 DIFFERING SITE CONDITIONS <br /> (CHANGED CONDITIONS); <br /> 3. The Contractor knows,or should with the reasonable exercise of ordinary care know, <br /> of a Delay or an event that may cause a Delay; <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> 1 <br /> WO No—UP3398-31 SP - 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.