My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1-05.1 City <br /> (******) <br /> The City, and the City's Representative, shall have the authority to act as the sole judge of the Work <br /> and materials with respect to both quantity and quality as set forth in the Contract. It is expressly <br /> stipulated that the Plans, Specifications and other Contract Documents set forth the requirements as <br /> to the nature of the completed Work and do not purport to control the method of performing Work <br /> except in those instances where the nature of the completed Work is dependent on the method of <br /> performance. <br /> The City has the authority to act, do, perform, and make all decisions and actions authorized by the <br /> Contract Documents, including, but not limited to, Change Orders, progress payments, contract <br /> decisions,acceptability of the Contractor's Work,and early possession. The City has the authority to <br /> accept or reject requests for progress payments that have been submitted by the Contractor and <br /> recommended by the City's Representative.The City has the authority to make determinations of the <br /> acceptability of the Work. The City also has the authority to accept or reject the City's <br /> Representative's recommendations regarding retention of defective Work. <br /> 1-05.2 Authority of Assistants and Inspectors <br /> Delete 1-05.2 and substitute the following: <br /> 1-05.2 City's Representative <br /> (******) <br /> The City's Representative shall be satisfied that all the Work is being done in accordance with the <br /> requirements of the Contract. The Contract and Specifications give the City's Representative <br /> authority over the Work. Whenever it is so provided in this Contract, the decision of the City's <br /> Representative shall be final. <br /> The City's Representative's decisions will be fmal on all questions including, but not limited to, the <br /> following: <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work,whether lump sum,Force Account, or unit price; <br /> 3. Acceptability of rates of progress on the Work; <br /> 4. Interpretation of Plans and Specifications; <br /> 5. Determination as to the existence of changed or differing site conditions; <br /> 6. Fulfillment of the Contract by the Contractor; <br /> 7. Payments under the Contract including adjustment; <br /> 8. Suspension(s)of Work; <br /> 9. Termination of the Contract for default or public convenience;and <br /> 10. Approval of working or detail Plans and Submittals. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from the <br /> City's Representative: <br /> 1. The City's Representative may use the City's resources,other contractors,or other means <br /> to accomplish the Work; and <br /> 2. The City will not be obligated to pay the Contractor,and will deduct from the Contractor's <br /> payments,costs that result when other means are used to carry out the Contract <br /> requirements or City's Representative's orders. <br /> At the Contractor's risk,the City's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms,to carry out the City's Representative's <br /> orders, or to correct unsafe conditions of any nature;or <br /> 2. It is in the public interest. <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> ' WO No—UP3398-31 SP-67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.