Laserfiche WebLink
I <br /> ICITY OF EVERETT,WASHINGTON <br /> SPECIFICATIONS FOR <br /> HAYES STREET REGULATOR AND CSO CONTROLS(SRO1,SRO2,AND SRO3) <br /> WORK ORDER#UP 3398-31 <br /> NOTICE TO CONTRACTORS <br /> I Notice is hereby given that sealed bids for the HAYES STREET REGULATOR AND CSO <br /> CONTROLS (SRO1, SRO2, AND SRO3) will be received by the City Clerk at the City <br /> Clerk's Office, 1st Floor Wall Street Building, 2930 Wetmore, Everett, Washington 98201, until <br /> 2:00 p.m., on Tuesday, March 7, 2017, At the appointed time, all bids will be opened and <br /> publicly read aloud in the eighth (8th) floor hearing room at the Wall Street Building. The <br /> engineer's estimate for this project is $3,750,000. <br /> IWork being performed includes, but is not limited to, furnishing all labor, materials and <br /> equipment necessary to construct approximately 550 LF of new combined sewer pipe (30-inch to <br /> 72-inch dia.); removal of approximately 325 LF of existing combined sewer pipe (30-inch to 48- <br /> inch dia.); construction of five (5) separate underground flow regulator, screening, or monitoring <br /> concrete vaults; structural modifications within a large existing underground concrete siphon- <br /> pipe headworks facility, including demolition of the above-ground entry structure; manhole <br /> furnish and install mechanical screen equipment system at lift station #9; installation of <br /> I temporary flow diversion and bypass systems; approximately 180 LF of existing 8-inch gravity <br /> sanitary sewer relocation and service re-connects; electrical power and control ductbanks; <br /> construction of approximately 600 LF of new 24-foot wide paved access drive; existing street <br /> and site asphalt pavement restoration; permanent fence installation, landscaping and performing <br /> all Work as required by the Contract, in accordance with the Contract Plans and Contract <br /> Provisions. <br /> 1 Plans, specifications, addenda, and plan holders list for this project may be viewed on line at <br /> http://www.everettwa.org/bidscontracts/bids.asp <br /> I Plan sets may also be purchased for reproduction costs at Bill's Blueprints (425-259-0859) at <br /> 2920 Rockefeller Avenue, Everett, WA 98201. <br /> t <br /> For technical questions regarding this project, contact David Voigt, Project Engineer, City of <br /> Everett, at 425-257-8983. Bidders shall refer to Special Provisions Section 1-08.4(2) Special <br /> Construction Constraints for specific project coordination and scheduling requirements as well as <br /> completion milestones and deadlines. A pre-bid site visit/meeting is scheduled for February 23, <br /> g2017. See Special Provisions Section 1-02.4(1)C for details.. <br /> All proposals must be made upon the regular forms provided in the Proposal Section of the <br /> contract documents, with unit prices and totals. The proposal must be accompanied by a bid <br /> bond or certified check in an amount not less than 5%of the bidder's total bid amount. <br /> The City reserves the right to reject any and all bids and waive any irregularities or informalities. <br /> No bidder may withdraw his bid after the hour set for the opening thereof. The City further <br /> reserves the right to make the bid award as deemed in the best interest of the City. <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> I AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP- 1 <br />