R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IThe costs for power, gas, labor, material, supplies, and everything else needed to successfully <br /> complete operational testing, shall be included in the unit contract prices related to the system <br /> I/ being tested, unless specifically set forth otherwise in the Proposal. <br /> Operational and test periods, when required by the Engineer, shall not affect a manufacturer's <br /> guaranties or warranties furnished under the terms of the Contract. <br /> 1-05.12 Final Acceptance <br /> Delete all of 1-05.12 and substitute the following: <br /> The Contractor shall perform all the obligations under the Contract before the completion date <br /> $ can be established. A certificate of completion of the Work issued by the City will establish the <br /> completion date and certify the Work as complete. The following shall occur before the <br /> completion date can be established: <br /> The Final Contract Voucher Certification shall be signed by the Contractor verifying agreement <br /> to the final contract price. <br /> The physical work on the Project shall be complete. <br /> I The Contractor shall furnish all documentation required by the Contract and required by law, <br /> necessary to allow the City to certify the Contract as complete. <br /> A certificate of completion for the Work, signed by the City, will constitute acceptance of the <br /> I Work. The issuance of this certificate of completion will not constitute acceptance of <br /> unauthorized or defective Work, Equipment, or materials. <br /> The Contractor agrees that neither completion nor final acceptance shall relieve the Contractor <br /> I of the responsibility to indemnify, defend, and protect the City against any claim or loss <br /> resulting from the failure of the Contractor, or the Subcontractors or lower tier subcontractors, <br /> to pay all laborers, mechanics, Subcontractors, material persons, or any other person who <br /> I provides labor, supplies, or provisions for carrying out the Work or for any payments required <br /> for unemployment compensation under Title 50 RCW or for industrial insurance and medical <br /> aid required under Title 51 RCW. <br /> Failure of the Contractor to perform all of the Contractor's obligations under the Contract shall <br /> i not bar the City from unilaterally certifying the Contract complete so the Engineer may <br /> calculate a final contract price as provided in 1-09.9 PAYMENTS. <br /> I 1-05.13 Superintendents,Labor and Equipment of Contractor <br /> Delete 1-05.13. <br /> 1-05.14 Cooperation with Other Contractors <br /> Delete all of 1-05.14 and substitute the following: <br /> Nothing in the Contract shall be interpreted as granting to the Contractor exclusive occupancy <br /> of the Project area. The Contractor shall ascertain to its own satisfaction the scope of the Project <br /> t and the nature of any other contracts that have been or may be awarded by the City in the <br /> construction of the Project, or to the end that the Contractor may perform this Contract in the <br /> light of such other contracts,if any. <br /> I The Contractor shall not cause unnecessary hindrance or Delay to others working on this or <br /> other projects. If the performance of a contract for the Project is likely to be interfered with by <br /> the simultaneous performance of some other contract or contracts, the Engineer will decide <br /> I which Contractor shall cease Work temporarily and which Contractor shall continue,or whether <br /> the Work under the contracts can be coordinated so that the contractors may proceed <br /> simultaneously. On all questions concerning conflicting interest of contractors performing <br /> related Work, the decision of the Engineer shall be binding upon all contractors concerned and <br /> the City, the Engineer, the City's Representative, and their consultants shall not be responsible <br /> I <br /> for any damages suffered or extra costs incurred by the Contractor resulting directly or <br /> indirectly from the Award or performance or attempted performance of any other contract or <br /> i <br /> HAYES STREET REGULATOR February, 2017 <br /> I AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP - 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.