My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />Professional Services <br />Agreement with HDR <br />Engineering, Inc. to Provide <br />Engineering and <br />Construction Management <br />Services for the Everett <br />Water Pollution Control <br />Facility Diversion Structure <br />Zero —Pre -Design Phase <br />project <br />Location <br />Everett Water Pollution <br />Control Facilities on <br />Smith Island <br />Briefing <br />Proposed Action <br />Consent <br />Action <br />First Reading <br />_ Second Reading <br />Third Reading <br />Public Hearing <br />Preceding Action <br />2014 Comprehensive <br />Sewer Plan <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Initialed by: <br />15 <br />Public Works'- <br />Souheil Nasr <br />(425) 257-7210 <br />August 26, <br />2015 <br />Department Head <br />CAA_ <br />Council President <br />l <br />Attachments <br />Professional Services <br />Agreement <br />Department(s) Approval <br />Public Works,. Legal <br />Amount Budgeted <br />$7,800,000 <br />Expenditure Required <br />$176,632 <br />AccountNumber(s): UP -3625 <br />Budget Remaining <br />$7,623,368 <br />Additional Required <br />-0- <br />DETAILED SUMMARY STATEMENT: <br />This professional services agreement with HDR is to provide pre -design services for capacity updates to the <br />Everett Water Pollution Control Facility Diversion Structure Zero (DS -0). The capacity of the siphon pipes <br />between the Siphon Headworks on the west side of the river and DS -0 on the east side is limited by hydraulic <br />restrictions in DS -0. Installing a large diameter gravity pipe or a pumping station discharging to the <br />Oxidation Pond would reduce surcharging in DS -0, thus increasing the capacity of the siphons and <br />maintaining Snohomish River Outfall No. 3 (SR03) in Combined Sewer Overflow (CSO) regulatory <br />compliance. This project is listed in the CSO Agreed Order to be on line by Dec. 31, 2017. <br />The project will proceed in two phases; the (1) pre -design phase will evaluate several alternatives and the (2) <br />design phase will implement the preferred alterative through design and construction. The Council will be <br />asked to authorize the design phase through a supplemental agreement at a later date. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize Mayor to Sign a Professional Services Agreement with HDR Engineering, Inc. to Provide <br />Engineering and Construction Management Services for the Everett Nater Pollution Control Facility <br />Diversion Structure Zero project— Pre -Design Phase in the amount of S17c,u33?. <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.