My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL, AGENDA 171 EM COVER SHEET <br />PROJECT TITLE: <br />An Ordinance creating a <br />special improvement project <br />entitled, "Citywide Intersection <br />Signing," Fund 303, Program <br />105, to accumulate all costs for <br />the improvement <br />Briefing <br />Proposed Action <br />Consent <br />Action . <br />First Reading <br />Secon, l Reading <br />Third Reading <br />Public Hearing <br />Budget Advisory <br />COUNCIL BILL T <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Public Works <br />Ryan Sass <br />(425) 257-8942 <br />August 26, 2015 <br />Location <br />Preceding Action <br />Attachments <br />Departmeni(s) Approval <br />Various Intersections <br />None <br />Ordinance <br />Legal, Public Works <br />r <br />unt Budgeted $1,062,122enditure Required $1,062,122 AccountNumber(s): PW 3628 <br />get Remaining -0- <br />Additional Required4::_ -0- <br />DETAILED Sl MAIARY STATEMENT: <br />This project will evaluate approximately 2,000 stop and yield signs, "4 -Way " and "All -Way" plaques, and <br />sign posts throughout the City for compliance with Manual on Uniform Traffic Control Devices (MUTCD) <br />standards, as modified by WAC 468-95. <br />Signage will be upgraded as necessary with high intensity prismatic sheeting. A Federal Highway Safety <br />1rilprovement Progran (HSIP) grant will provide $965,566 for design and construction of the improvements <br />with local snatching funds providing the balance. <br />The budget for this project is $1,062,122 and the source of finzds are: <br />Federal Grant (HSIP) $965,566 <br />Fund 119 — Street linprovements 96-'16 <br />Total Funds $1.062.122 <br />yy ;' " ''� -= w r, ; r; ,C ion egt:cs 'd of Ccn_,lc i): <br />_U, <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.