My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16, <br />OP.DINAT*ICE NO. <br />AN ORDINANCE creating a special improvement project entitled, <br />"Broadway 10th St. to 19th St. Intersection Safety," Fund 303, <br />Program 104, to accumulate all costs for the improvement. <br />WHEREAS, the City of Everett is committed to a planned pedestrian safety program; and <br />WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br />pedestrian improvements to federal arterial street segments; and <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1: <br />A special improvement project is hereby established as Fund 303, Program 104, entitled <br />"Broadway 10th St. to 19th St. Intersection Safety," to accumulate all costs for the <br />improvement. <br />Section 2: <br />Authorization is hereby given to accumulate costs and distribute payments from Fused 303, <br />Program 104, for the improvement project. <br />Section 3: <br />Authorization is hereby granted for the "Public Works Director" or "City Engineer.- under <br />direction of the Mayor, to assume Rill and complete responsibility for conducting all tasks and <br />doing all things to accomplish the actions authorized in this ordinance. <br />Section 4: <br />The sum of $608,987 is hereby appropriated to Fund 303, Program 104, "Broadit:ay 10th St. -to <br />19th St. Intersection Sa_ety," as follows: <br />A. Estimated Project Costs <br />Design and Construction $ 608,987 <br />Total Estimated Cost � 608.987 <br />B. Source of Funds <br />HSIP -Federal Funds $ 331;3'-'=' <br />uind 1! 9 — Street //,OAr31 <br />142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.