My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />11", <br />Professional services <br />Briefing <br />COUNCIL BILL # <br />Expenditure Required <br />agreement with KDW Salas <br />Proposed Action <br />Originating Department <br />Utilities <br />O'Brien LLC to provide <br />Consent <br />Contact Person <br />Mike Robinson <br />electrical engineering <br />X Action <br />Phone Number <br />425-257-8884 <br />consultation services for the <br />First Reading <br />FOR AGENDA OF <br />September 2, 2015 <br />Water Filtration Plant <br />Second Reading <br />Third Reading <br />Public Hearing <br />Budget Advisory <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Location <br />Preceding Action Attachments Department(s) Approval <br />Water Filtration Plant - <br />None Professional <br />6133 Lake Chaplain <br />Services Agreement <br />Road, Sultan WA <br />Amount Budgeted <br />$150,000 <br />Expenditure Required <br />$77,720 <br />Account Number(s): 401-5-200-121-923-410 <br />Budget Remaining <br />$72,280 <br />Additional Required <br />0 <br />DETAILED SUMMARY STATEMENT: <br />This professional services agreement with KDW Salas O'Brien LLC in the amount of $77,720 will provide <br />electrical engineering services for the Water Filtration Plant Asset Refurbishment Program. The majority of <br />the Water Filtration Plant's electrical equipment is nearing end of service life and requires extensive <br />rehabilitation or replacement. <br />This professional service agreement includes consultation services for assessing material condition of <br />existing equipment, recommending practices for extending equipment life, and advising on specifications for <br />replacement equipment. Services will also include training of staff on the best practices and procedures to <br />maximize equipment life and operability. <br />RE,COMMENDATION (Exact action requested of Council): <br />Authorize the 1vl aver to cion the lrolessional sen -vices ag.l—enlent l�rl`lti K. UV';7 Salas O'Brien L C toy pro *de <br />c e:'lriC ea' iitC=i1: Chit l', "i at?OIl .erg iCC "i:; 1 Llle "i ?LCr i i�Lall ii !J:__l[ i l ,illUi nL �l S 7. 0. <br />145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.