• TranTech will work from the as-built plans and the inventory inspection report to provide <br /> the most accurate condition for the load rating calculations. <br /> • Existing load rating analysis will be reviewed and utilized to the extent possible. <br /> • Some existing load rating analysis may be of little or no use for the update process <br /> requiring a complete re-rating. <br /> • No substructure load rating is performed. <br /> Task 2—Funding Assistance <br /> A Federal Bridge Program Call for Projects has been advertised. Task 2 consists of assisting the <br /> City in the development of a bridge replacement/rehabilitation application package to be <br /> submitted to Bridge Replacement Advisory Committee(BRAC) for the Merrill&Ring and <br /> Edgewater bridges carrying the Mukilteo Blvd. facility. The information obtained from Task 1 <br /> activities will be utilized in this Task. <br /> For Merrill&Ring Bridge, first a viable rehabilitation alternative will be developed for <br /> strengthening the existing bridge elements that have rating factors below 1.0.Next, construction <br /> cost estimation activities for the chosen rehabilitation scheme will be undertaken. <br /> Moreover, TranTech's team will perform a preliminary seismic retrofit assessment for the <br /> Merrill &Ring Bridge and our team will prepare a construction cost estimate for viable seismic <br /> retrofit measurements that match well with the aforementioned rehabilitation scheme. The <br /> seismic retrofit cost will be included for a separate submittal as a Seismic Program project for <br /> funding consideration. <br /> For Edgewater Bridge,first a minimum of two viable bridge replacement alternatives will be <br /> studied and the results and recommendations will be communicated to the City. Following <br /> obtaining guidance from the City regarding the alternative of choice,construction cost estimation <br /> activities for the chosen bridge replacement scheme will be developed. <br /> TranTech will prepare a structural assessment memos for the both bridges and will submit them <br /> to the City. <br /> TranTech will provide overall assistance for the initial submittal package preparation per the Call <br /> for Projects requirements and deadlines. Also included, will be continued support through the <br /> spring and summer candidate review period and through the funding meeting in the Fall of 2017. <br /> Deliverables <br /> • Structural Assessment Memos for Edgewater and Merrill &Ring. <br /> • Draft&Final BRAC applications for Edgewater and Merrill &Ring bridges by 4/2/17. <br /> Task 3—Miscellaneous Bridge Program Support <br /> TranTech will provide miscellaneous engineering support under the supervision of the City <br /> Engineer, Mr. Ryan Sass, PE. Anticipated work will include peer reviews, misc. structural <br /> design, field inspections and reconnaissance, and other desired structural services, as needed <br /> on identified future tasks. <br /> City of Everett Bridge Program Engineering Support--SCOPE OF WORK Page 3 <br /> TRANTECH ENGINEERING <br />