My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2618 159TH AVE SE LINE 3 2016-01-01 MF Import
>
Address Records
>
159TH AVE SE
>
2618
>
LINE 3
>
2618 159TH AVE SE LINE 3 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2017 2:50:27 PM
Creation date
5/25/2017 2:50:24 PM
Metadata
Fields
Template:
Address Document
Street Name
159TH AVE SE
Street Number
2618
Tenant Name
LINE 3
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�M'kk��M1Ck <br />" <br />SiA1E UF W�s�ilh��.i�w. <br />DEPARTME�T OF SOCIAL A�U hILALTH SERVICCS <br />IJIH �m�lh luww. 91.'.'� • ?rd"r tl.nninKfnn 4H1(N <br />Harch 4, 1985 <br />Richard A. Hard[, P. E. <br />Night and Hard�, Inc. <br />2J22 Colby Avenue <br />Suite 611 <br />Everett, Nashiny[on 98201 <br />Subject: Proposed Machias RiJae East Community Watcr <br />$ys[em <br />Dear Rick: <br />The following commen[s and requests stem from my review of the <br />above-noced submittal. <br />I) Under WAC 248-5�+-Z04, continuity of service, the requirement of re- <br />liabili[y is addressed. Our guidelines s>eak to Ihis issue through the <br />concept of storage. Since you hope to use the Everett mainline to <br />satisfy our reliability concerns, please submi[ the following: <br />✓ a) A letter from Evere[t that they consider Che transmission <br />line to be reliable enough for aater systems [o be used as a <br />stora e ity. Reliability in this case would be [he <br />ability to provide water all year round with no nore than one <br />or two outages for no more than a few hou�ssach time. <br />�/ b) Along with a let[er from Everett, 1 vrould appreciate some <br />information on the reliability of the Everet[ line: Informa- <br />tion on how many [imes that portion of [he Itne has been shut <br />down in Che last year, what happens hydraulically when a break <br />occurs, the line ts valved off, or the flows are reduced. <br />2) I also noted that the 39 9Pm/115 foot TDH mark on your pump <br />performance shee[ lies on an efficiency curve and is [hus not a point <br />at which the proposed pwap can operate. ?umps can operate only <br />along the pump curve. <br />3) Please submit a simple opera[ion and main[enance manual for the <br />system. It should include a reference [o the minimum moni[oring re- <br />quired for this system; phone numbers of equipment suppliers; general <br />equipment operation directions; ahat to do if certain things go v,rong; <br />phone numDers for emergency response (such as wa[er outages, Power out- <br />ANlEN RAF4N <br />SKrcixv <br />
The URL can be used to link to this page
Your browser does not support the video tag.