My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10318 215TH AVE SE LINE 5 2016-01-01 MF Import
>
Address Records
>
215TH AVE SE
>
10318
>
LINE 5
>
10318 215TH AVE SE LINE 5 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2017 2:58:53 PM
Creation date
5/25/2017 2:58:51 PM
Metadata
Fields
Template:
Address Document
Street Name
215TH AVE SE
Street Number
10318
Tenant Name
LINE 5
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />06/02/1995 <br />------------------------------------------------------------------------- <br />------------------------------------------------------------------------- <br />Drite Range :O1/09/1989 - 05/18/1995 <br />C:M Work Order Range :1001091070001 - 8801086100085Pattern :5201186760002 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />�� <br />Page 1 <br />CM WORK ORDER IU: 520118G7G0002 Title: REPLACE 30318 215TH SE, �;dOHOMISH <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- 1F�AnS t.nf #1`j <br />Location ID: -- <br />Program 520 Function 118 Activity G76 <br />Date Completed: 05/18/1995 <br />Overall Craft: <br />Issued: 05/70/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: o hours <br />Status: <br />Issued by: RJW Assigned to: <br />Prioiity: Travel 'Iime: 0.00 Hr. <br />Labor: <br />Craft ID Name Planned Hrs Actual Hrs <br />----- ------ ------------------------------ ------�----- ---------- -- <br />UL GDJ GOSS, DANNY JAMES 0.00 6.00 <br />SUP2 GJ GARZA, JOHN (NMI) 0.00 2.00 <br />Sf7P1 WMW WARD, MICHAEL W. 0.00 6.00 <br />Tot�l Labor Cost: <br />Materials: <br />ID Description Date # Used <br />------------ ------------------------------ -------- -�------- - <br />COUP36103447 COUPLSNG 1" THREADED BRASS " 05/18/1995 1 <br />NIPP36132247 NIPPLE 1" CLASE BRASS ' 05/18/1995 2 <br />Total Material Cost: � <br />Vehicles: <br />ID Descti.ption HouLs Cost <br />------------ ------------------------------- ------ ---------- <br />V0017 94 FORD ALROSTAR VAN 2.00 10.00 <br />Total Vehicle Cost: 10.00 <br />Cost <br />73.26 <br />49.30 <br />129.06 <br />251.62 <br />Cost <br />2.48 <br />2.18 <br />4.66 <br />Work Description: <br />-------------------------------•------------------------------------------------- <br />CliANGE OUT 1" METER AND PUT ZN 1" NEPTUIJE PRO READ REMOTE WHICH IS IN METER <br />SHOP. SEE MR. RICE FOR DETAILS. <br />Total cost for work �rder 520118676000?.: <br />266.28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.