Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />10/28/1998 Page 1 <br />Date Range :06/24/1900 - 10/21/1998 <br />CM Work Order Range :0810800810001 - UT2883- - Pattern 5201186760417 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 5201186760417 Title: REPLACE 16319 82ND ST SE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: -- <br />Location ID: -- <br />Program 520 Function 118 Activity 676 <br />Date Completed: 10/08/1998 <br />Overall Craft: <br />Issued: 09/17/1998 Issued by: RJW Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />HEO BJC <br />SUP2 GJ <br />DLI MTL2 <br />UL MWE <br />WST NSO <br />HEO SR <br />UL SWU <br />Materials: <br />ID <br />METE42147447 <br />N/A <br />SUPP42145947 <br />Vehicles: <br />ID <br />V0017 <br />V0038 <br />V2137 <br />V2139 <br />V2151 <br />VH0010 <br />VJ0010 <br />VJ0020 <br />Name <br />BOHNERT, JAMES C. <br />GARZA, JOHN (NMI) <br />MARtJiAM, TIMOTHY L. <br />MOORE, WARREN E. <br />NIELSEN, SCOTT O. <br />SIERRA, RAMON (NMI) <br />STENSETH, WOB URT <br />Description <br />------------------------------ <br />METER 4" NEPTUNE PROTECTUS 111 <br />4" FLANGE KIT <br />SUPPORT PIPE 4" <br />Description <br />94 FORD AEROSTAR VAN <br />'96 FORD 3/4 TON 4WD <br />84 GMC BOOM TRUCK 5 TON <br />86 CHEV 1-TON W/HYD. UNIT <br />86 CHEV 1 TON FYD. UNIT <br />96 CAT BACKHOE <br />95 INTERNATIONAL BOOM TRUCK <br />096 FORD DUMP 10 YARD <br />Planned Hrs Actual Hrs Cost <br />0.00 <br />4.00 <br />84.8' <br />0.00 <br />2.00 <br />53.04 <br />0.00 <br />4.00 <br />38.00 <br />0.00 <br />5.00 <br />81.70 <br />0.00 <br />8.00 <br />166.16 <br />0.00 <br />5.00 <br />1U5.25 <br />0.00 <br />4.00 <br />65.92 <br />Total Labor Cost: 594.87 <br />Date <br /># Used <br />• Cost <br />-------- <br />10/08/1998 <br />-------- <br />1 <br />---------- <br />5173.15 <br />10/08/1998 <br />? <br />7.28 <br />10/08/1998 <br />_ <br />2 <br />116.08 <br />Total Material Cost: <br />5296.51 <br />Hours <br />Cost_ <br />st ;,�9,�3 <br />---------------- <br />2.00 <br />9.40 <br />4.00 <br />23.60 <br />4.00 <br />88.00 <br />4.00 <br />19.20 <br />4.00 <br />22.40 <br />3.00 <br />75.60 <br />3.00 <br />139.80 <br />5.00 <br />111.00 <br />Total Vehicie Cost: 489.00 <br />