My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/21 Council Minutes
>
Council Minutes
>
2015/09/21 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 12:09:31 PM
Creation date
9/10/2015 3:51:44 PM
Metadata
Fields
Template:
Council Minutes
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 2, 2015 <br />COUNCIL BILL NO. 1508-20 <br />THIRD AND FINAL READING: <br />AN ORDINANCE creating a Special Improvement Project entitled <br />"Broadway 10th St. to 19th St. Intersection Safety," Fund 303, <br />Program 104, to accumulate all costs for the improvement. <br />Moved by Council Member Murphy, seconded by Council Member <br />Roberts, that this is declared to be the third and final reading of Council <br />Bill No. 1508-20 and the City Clerk is directed to call the roll for the final <br />disposition of the ordinance. <br />AYES: Roberts, Moore, Murphy, Gipson, Bader, Stonecipher, <br />Tuohy <br />NAYS: None <br />Ordinance No. 3446-15 adopted. <br />AGREEMENT — ELECTRICAL ENGINEERING SERVICES / WFP <br />Moved by Council Member Roberts, seconded by Council Member <br />Stonecipher, to authorize the Mayor to sign the Professional <br />Services Agreement with KDW Salas O'Brien LLC to provide <br />electrical engineering consultation services for the Water Filtration <br />Plant in the amount of $77,720.00. <br />Roll was called with all council members voting yes. <br />Motion carried. <br />AGREEMENT — ENGINEERING DESIGN SERVICES / PORTAL #4 AND <br />WFP SAFETY RAILING CODE REQUIREMENTS <br />Moved by Council Member Roberts, seconded by Council Member <br />Tuohy, to authorize the Mayor to sign to sign the Professional <br />Services Agreement with CG Engineering to provide engineering <br />design services for portal #4 refurbishment, backwash pump station <br />269 <br />
The URL can be used to link to this page
Your browser does not support the video tag.