My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6282
>
Resolutions
>
Resolution 6282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 10:04:54 AM
Creation date
5/26/2017 10:04:35 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6282
Date
6/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2011 To 2016 Six-year Transportation Improvement Program <br /> Interstate Local Access and Other Projects <br /> 1. I-5 /Downtown Everett Interchange Access Improvements 1. BNSF RR safety improvements (Safety) <br /> ' (Everett Ave.Hewitt Ave.,US 2,Pacific Ave.) 2. Local roadway safety projects (Safety) <br /> 2. I-5 / 100th Street SE HOV Access/Undercrossing 3. Safe routes to schools (Safety) <br /> 3. NB Everett Mall Way/SB I-5 Onramp <br /> 4. I-5 /Smith Island Interchange(12th St.or SR 529) 1. Annual Street Overlay Program (Maintenance) <br /> 5. I-5 /East Marine View Drive Interchange Improvements 2. Sidewalk repair and replacement (Maintenance) <br /> 6. I-5 HOV Lanes (US 2 to SR 528) 3. Pavement marking projects (Maintenance) <br /> 7. I-5 / 128th Street Interchange 4. Bridge Rehabilitation Program (Maintenance) <br /> 8. I-5 / 128th Street HOV Ramps (Mariner PNR) <br /> 9. I-5 / 112th Street Interchange Study 1. 106th Place SE Improvements (Street) <br /> 2. 3rd Avenue SE Improvements (Street) <br /> Freeways 3. Local Street Improvements (Pine,Fulton,etc.) (Street) <br /> 1. US 2 Improvements (I-5 to SR 204) 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 2. SR 526/Hardeson Road Interchange 5. Simpson Site Access Improvements (Street) <br /> 3. SR 526 Extension(I-5 to US 2) 6. Downtown Streetscape Improvements (Street) <br /> 4. SR 526/Evergreen Way Interchange <br /> 5. SR 529/Smith Island Ramps 1. Traffic Signal Central Control Repl. (Traffic Signals) <br /> 6. SR 526/40th Avenue W.Intersection Improvements 2. Traffic Signal Interconnect (Traffic Signals) <br /> 3. Traffic Signal Improvements (Traffic Signals) <br /> Principal Arterials <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements 1. Neighborhood Block Grants (Neighborhoods) <br /> 2. Broadway Bridge Replacement(Bridge#529/5a) 2. Neighborhood Traffic Studies/Proj. (Neighborhoods) <br /> 3. Broadway Corridor Improvements (SR 529 to SR 526) 3. Residential Sidewalks (Neighborhoods) <br /> 4. SR 99/Evergreen Way BRT Improvements. (128th to Pacific) <br /> 5. Arterial Safety Projects (Forest Park,I-5 and Pacific,etc.) 1. City Entryway Landscaping/Signs (Landscaping) <br /> 6. Pacific Avenue/BNSF Grade Crossing Improvements <br /> 7. Evergreen Way Improvements (41st St.to Gipson Road) Non-Motorized Trail/Path Improvements <br /> 8. I-5 to Port of Everett Truck Route 1. Riverfront Walkway Phase II <br /> 9. Mukilteo Blvd.Safety Imp. (Friday Ave.to City Limits) 2. East Grand Walkway Connection <br /> 10. Arterial Needs Study 3. 7th Avenue SE Ped/Bike Improvements (92nd to 112th) <br /> 4. Henry M.Jackson Ped.Bridge <br /> Minor Arterials 5. 36th St. (or vicinity)/BNSF Rail Line Ped/Bike Crossing <br /> 1. 112th Street SW-SE Street Improvements (I-5 to SR 527) 6. Smith Island Bike and Pedestrian Improvements <br /> 2. 116th Street SE Street Improvements (SR 527 to 35th) 7. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 3. 100th Street SW Street Improv. (4th Ave.W.to Airport) 8. West/East Marine View Drive Bike-Ped Improvements <br /> 4. Casino Rd. Safety Improvements (Evergreen to 5th Ave.) 9. 47th Street Ped Improvements (Evergreen to Black Forest Lane) <br /> 5. 4th Avenue West Improvements (104th to 112th) 10. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 6. 100th Street SE Improvements (SR 527 to 7th Ave SE) 11. Grand Avenue/North Marina Ped-Bike Connection <br /> 7. 100th Street SE Improvements (7th Ave to Evergreen) 12. Shoreline Access Imp. (Various Locations) <br /> 8. 110th Street SE Improvements (SR 527 to 35th St.) 13. Snohomish River Bike/Pedestrian Bridge Evaluation <br /> 9. Lenora St./Lowell-River Rd./BNSF Rail Line Oxing 14. Pigeon Creek Rd.No. 1 Improvements <br /> 10. Minor Arterial Streetscape Improvements 15. Everett Non-motorized Projects (Various Locations in Everett) <br /> 16. Lowell Snohomish River Road.Bike/Ped Connection <br /> Collector Arterials 17. Riverfront District Bike/Ped Paths <br /> 1. East Everett Avenue/BNSF Overcrossing 18. Interurban Trail Bike/Ped Path Improvements <br /> 2. Bond Street Ped/Bike Improvements. (Kromer to Terminal) <br /> 3. Chestnut St. /Eclipse Mill Road.Improvements (Pacific to 36th) Transit <br /> 4. Silver Lake Road-121st Street SE Ped.Improvements 1. Bus Replacements-2011 to 2016 <br /> 5. 36th St./BNSF At-grade Rail Crossing Closure 2. Implementation of State CTR Law <br /> 6. 37th Street Improvements (Rucker to Broadway) 3. Midtown Transit Center <br /> 7. Collector Arterial Streetscape Improvements 4. Everett Station Repair and Updates <br /> 5. Base Relocation <br /> 6. Transit Voice Communications Update <br /> 7. Transit Priority Equipment <br /> 8. Riverfront to Harborfront Connector <br /> HOV Projects <br /> 1. Everett Station Park&Ride Parking Structure <br /> Projects in bold type not included in 2010-2015 TIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.