Laserfiche WebLink
11. Supports for solar modules are installed to spread the dead load across as many roof- <br /> framing members as needed to ensure that no point load exceeds fifty(50) pounds. D C3 <br /> [IRC M2302.2.1(5)) <br /> 12. The photovoltaic modules and supporting structure shall be constructed of <br /> noncombustible materials or fire-retardant treated wood equivalent to that required for Q 0 <br /> the roof construction. [IRC M2302.2.1] <br /> 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, 0 <br /> rodents,and insects. [IRC M2302.2.21 <br /> 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. <br /> [IRC M2302.2.3] <br /> Comments: <br /> If you answered yes to all of the above questions,the project qualifies for the over-the- <br /> counter permitting process. <br /> Q Submit this Checklist, Site Plan, and other required permit application forms to: <br /> [insert contact info for jurisdiction having authority] <br /> As the property owner or authorized representative of the above listed property, I attest that <br /> all information in this checklist is accurate to the best of my knowledge. <br /> Applicant Signature: Q .�---�'"" w Date: 3/30/17 <br /> Applicant Name(Please Print): Jesse Anderson <br /> --------TO BE COMPLETED BY CITY STAFF------ <br /> Qualifies for OTC Building Permit? ❑Yes ❑No Permit Application#: <br /> Staff Initials Date. <br />