Laserfiche WebLink
INSPECTION REPORT <br /> Date: — Permit: tl, c <br /> Contractor: <br /> Owner:_ <br /> Site Address: l <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing Elooftop Units El Water Service <br /> F]Grounding F]Insulation Mechanical Final El Medical Gas <br /> F1 Ceiling Grid E:1 Drywall Nailing Q61umbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE / \ <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains [j Ceiling Grid refrigeration ❑ Rough In <br /> F]Roof drains Building Final Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> \PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> �] UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: ' <br /> EIR(4/09) Y�/GN/1Ti r/ azs/+«a-xmw <br />