Laserfiche WebLink
INSPECTION REPORT <br /> 2 USO0 009 <br /> Date: Permit: <br /> Contractor: <br /> Owner: <br /> Site Address:_._'e�)01�5 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab �E]Ceiling <br /> ❑ oundwork/Slab <br /> ❑Groundwork <br /> El El Rough In ugh In <br /> ❑Slab/Conduit El Foundation [-1CeilingGrid Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> /❑ —OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F-1 OK <br /> OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> FIR(4/09) T41� 1 RMti\ KOMf)TI(1Nti a25/JIIIi-!{'1011 <br />