Laserfiche WebLink
INSPECTION REPORT s�'SS <br /> Date Z k LA <br /> Permit: E <br /> Contractor: �rS <br /> r <br /> —L� r Z l Owner: f (�- <br /> Site Address: �() o ' <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ve <br /> ling Grid F]Drywall Nailing E]Plumbing Final <br /> ctrical Final F]Shear Nailing GAS PIPE <br /> WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final E]Gas Pipe Final(( ❑HWT Final <br /> OTHER OR CONSULTATION: _3l0 C) S ce 'T l <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PEPAUT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: _ Date: - 21 1-7 <br /> EIR(10/06) DATABAR,INC. <br />