Laserfiche WebLink
PUBLIC 4 .ORKS PERMIT Date: 3/1/2016 <br /> Public Works Permit#: PW1603-002 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 <br /> (425) 257-8810 Planning Reference#: <br /> Public Works Fee $: $ 45.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MURRAY TERRENCE MURRAY TERRENCE <br /> 3002 16TH ST 3002 16TH ST <br /> EVERETT WA 98201 EVERETT WA 98201 <br /> PHONE: 4257802937 PHONE: 4257802937 <br /> TAX PARCEL ID# SITE ADDRESS: 3002 16th St <br /> Construct Fence in the Public Right of Way <br /> This Permit includes a new at grade slab in the back yard to park one car. <br /> It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> rl . <br /> r� <br /> 4. Fence must be set back from the sidewalk a minimum of 2' as shown on the site plan. �, w <br /> 5. Fence must be a maximum of 42" tall to meet zoning code requirements. <br /> �a <br /> r._•a <br /> s= <br /> 6. Water meter, valves and hydrant must be outside the fenced area. F..,n <br /> 7. This fence constructed within the public right-of-way must be removed or relocated <br /> at the owner's expense if the City ever requires use of the right-of-way for municipal <br /> purposes. h <br /> 8. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 priori a' <br /> rs <br /> � a <br /> to starting construction and with all other inspection requests. See attached to request -,";:°_ <br /> an inspection <br /> Public Works Permit Fee Breakdown: <br /> Fence in R.O.W. $25.00 <br /> PW Site Inspection $20.00 �I <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> J / City of Everett from any and all claims for damages,costs,expenses,or <br /> causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> A roved for—�nstruction Date remove same upon notice from the City and to replace public property <br /> damaged t <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />