Laserfiche WebLink
INSPECTION REPORT <br /> Date3 201IPermit: Ilfnm 1 1 <br /> ^^ Contractor: _ <br /> 11v Owner: - - - �- - - - - - - --- <br /> Site Address: 3 W-1 l—r111% <br /> �Temp <br /> TYPE OF INSPECTION REQUESTED <br /> LECTRICAL BUILDING MECHANICAL PLUMBING <br /> Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> [,Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> *I Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final 2 E]HWT Final <br /> OTHER OR CONSULTATION: ci5ooIiI�4-1 ^S2 J5 <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> OR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> LVj <br /> C"& <br /> Inspector: Date: <br /> E I R(10/06) DATABAR,INC. <br />