Laserfiche WebLink
INSPECTION REPORT <br /> Date: I� Permit: O 1 <br /> Contractor: <br /> �D,30 Owner: <br /> Site Address: 7 © � <br /> TYPE OF INSPECTION REQUESTED <br /> Et-firCLRICAL BUILDING MECHANICAL PLUMBING <br /> e ❑LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑ <br /> Slab/Con d ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> n ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTQE,ROR CONSULTATION. <br /> rLL�A AL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: l� <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> (2U C-)(Z I <br /> Inspector: Mat : <br /> EIR(4/09) LQte rokna_s 1a111 111oNs •11,/4011-81)(111 <br />